KIMA plant
The ammonia and urea plant, built by Tecnimont and Orascom, makes 1,200 tonnes of ammonia per day and 1,575 tonnes of urea per day.
Aswan, in Upper Egypt, is home to the KIMA fertiliser company, whose ammonia and urea plant started up in 2020, and to long-established granite quarries. Ammonia and nitrate handling and quarry blasting create classified or controlled areas. An IECEx mobile phone distributor in Aswan would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Aswan has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Aswan: Ammonia and urea production, Nitric acid and ammonium nitrate handling (under construction), Quarry explosives storage | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Aswan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
The ammonia and urea plant, built by Tecnimont and Orascom, makes 1,200 tonnes of ammonia per day and 1,575 tonnes of urea per day.
A nitric acid and ammonium nitrate plant was contracted in 2023 for about USD 300 million, with 800 tonnes per day of ammonium nitrate targeted by the end of 2027.
Aswan lies on the east bank of the Nile just north of the Aswan Dam at the first cataract, which makes the river and dam the main reference points for access and logistics.
The older Aswan Low Dam was completed in 1902 and the High Dam was built 7 km upstream of it, so two generations of dam and power infrastructure sit close together at the first cataract.
Aswan is a busy market and tourist centre and a global winter tourist destination, so hotels, transport and visitors share the city with its industrial and utility sites.
Benban Solar Park, about 40 km north-west of Aswan, has 1.8 GW installed over 37.2 square km in 41 plots, connected through four new substations built by the Egyptian Electricity Transmission Company.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Aswan. KIMA was built by an international consortium, and the nitric acid and ammonium nitrate plant was contracted in 2023, so visiting engineers and EPC teams are likely. IECEx documentation, with a certificate of conformity and schedule of conditions, is a common reference. The IS-04Z1 is designed for that route; certification is in progress.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Aswan yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are ammonia and urea production, nitric acid and ammonium nitrate handling (under construction), quarry explosives storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Aswan.
Equipment usually enters through a major Egyptian port or Cairo airport and then travels by road, rail or a domestic flight to Aswan. Allow time for customs clearance and for any radio-equipment approvals, and agree delivery and on-site storage with the site contact before shipping.
Mostly utility and industrial: the dam and hydroelectric stations, substations, fuel storage and distribution, and the granite quarries. Aswan is not a refinery city, so hazardous zones are limited and site specific. Ask each operator whether any classified areas apply to your task.
Yes. Aswan has an extremely dry desert climate with very hot summers, so heat tolerance and dust are practical concerns. Check the datasheet's operating temperature range, avoid direct sun and keep charging in a shaded safe area. Ask the site operator about local practice in the hottest months.
Related guides for Aswan and for Egypt.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.