KIMA plant
The ammonia and urea plant, built by Tecnimont and Orascom, makes 1,200 tonnes of ammonia per day and 1,575 tonnes of urea per day.
Aswan, in Upper Egypt, is home to the KIMA fertiliser company, whose ammonia and urea plant started up in 2020, and to long-established granite quarries. Ammonia and nitrate handling and quarry blasting create classified or controlled areas. Distribution partners for Aswan are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Aswan has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Aswan: Ammonia and urea production, Nitric acid and ammonium nitrate handling (under construction), Quarry explosives storage | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Aswan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
The ammonia and urea plant, built by Tecnimont and Orascom, makes 1,200 tonnes of ammonia per day and 1,575 tonnes of urea per day.
A nitric acid and ammonium nitrate plant was contracted in 2023 for about USD 300 million, with 800 tonnes per day of ammonium nitrate targeted by the end of 2027.
Aswan lies on the east bank of the Nile just north of the Aswan Dam at the first cataract, which makes the river and dam the main reference points for access and logistics.
The older Aswan Low Dam was completed in 1902 and the High Dam was built 7 km upstream of it, so two generations of dam and power infrastructure sit close together at the first cataract.
Aswan is a busy market and tourist centre and a global winter tourist destination, so hotels, transport and visitors share the city with its industrial and utility sites.
Benban Solar Park, about 40 km north-west of Aswan, has 1.8 GW installed over 37.2 square km in 41 plots, connected through four new substations built by the Egyptian Electricity Transmission Company.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Aswan. A marking check for ammonia or nitrate areas should compare the gas group and temperature class with the operator's data, and check dust where relevant. The IS-04Z1 targets II 2 G Ex ib IIC T4, a gas marking only. Quarry explosives storage is a separate matter with its own rules.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Aswan. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
Likely candidates are ammonia and urea production, nitric acid and ammonium nitrate handling (under construction), quarry explosives storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Aswan.
Equipment usually enters through a major Egyptian port or Cairo airport and then travels by road, rail or a domestic flight to Aswan. Allow time for customs clearance and for any radio-equipment approvals, and agree delivery and on-site storage with the site contact before shipping.
Mostly utility and industrial: the dam and hydroelectric stations, substations, fuel storage and distribution, and the granite quarries. Aswan is not a refinery city, so hazardous zones are limited and site specific. Ask each operator whether any classified areas apply to your task.
Yes. Aswan has an extremely dry desert climate with very hot summers, so heat tolerance and dust are practical concerns. Check the datasheet's operating temperature range, avoid direct sun and keep charging in a shaded safe area. Ask the site operator about local practice in the hottest months.
Other guides for Aswan, other places in Egypt, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.