KIMA plant
The ammonia and urea plant, built by Tecnimont and Orascom, makes 1,200 tonnes of ammonia per day and 1,575 tonnes of urea per day.
Aswan, in Upper Egypt, is home to the KIMA fertiliser company, whose ammonia and urea plant started up in 2020, and to long-established granite quarries. Ammonia and nitrate handling and quarry blasting create classified or controlled areas. If you are specifying an ATEX and IECEx mobile phone for Aswan, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Aswan: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Aswan: Ammonia and urea production, Nitric acid and ammonium nitrate handling (under construction), Quarry explosives storage | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Aswan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The ammonia and urea plant, built by Tecnimont and Orascom, makes 1,200 tonnes of ammonia per day and 1,575 tonnes of urea per day.
A nitric acid and ammonium nitrate plant was contracted in 2023 for about USD 300 million, with 800 tonnes per day of ammonium nitrate targeted by the end of 2027.
Aswan's granite quarries supplied stone to many ancient monuments and are still operating today, so quarrying, blasting stores and heavy plant add a mining-type hazard profile near the city.
The Aswan High Dam was built across the Nile at Aswan between 1960 and 1970 to control flooding, store irrigation water and generate hydroelectricity, creating the Lake Nasser reservoir upstream.
Hydropower contributed 6% of Egypt's electricity in 2025 and wind and solar 7%, while fossil fuels still generated 87%, so Aswan's hydro is a small but visible part of the national mix.
Aswan is one of the hottest and driest cities in the world, with average summer highs consistently above 40 degrees Celsius from June to September, so heat management matters for outdoor equipment.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Aswan. A reviewer at the KIMA fertiliser plant in Aswan would expect certificate evidence suited to ammonia and urea production and the nitrate expansion. A dual ATEX and IECEx route helps because the plant was built by international contractors, Tecnimont and Orascom. The IS-04Z1 has no certificate issued.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are ammonia and urea production, nitric acid and ammonium nitrate handling (under construction), quarry explosives storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Aswan is in southern Egypt, where summers are typically very hot and dry, so check the maximum ambient temperature on the certificate, the dust ingress rating and battery behaviour in heat. Avoid leaving devices in vehicles or in direct sun, and plan outdoor work around the cooler hours.
Not necessarily, because zones depend on the specific area. Hydroelectric halls are often non-hazardous, while battery rooms, fuel stores, transformer oil areas and some tunnels may be classified. Request the operator's hazardous-area drawings and permit-to-work rules before deciding which devices to bring.
A nitric acid and ammonium nitrate plant was contracted in 2023, with 800 tonnes per day of ammonium nitrate targeted by the end of 2027. Construction and commissioning activity may therefore continue. Ask KIMA which areas are classified at present and how it handles contractor equipment.
More on Aswan, and on other places in Egypt.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.