Cold winters
Edmonton winters are cold enough that battery performance and glove use are practical considerations for outdoor work.
Alberta's Industrial Heartland covers 533 km2 across Fort Saskatchewan, Lamont, Strathcona and Sturgeon counties, plus the 49 km2 Edmonton Energy and Technology Park, for a total of 582 km2 east of Edmonton. Crude processing units, tank farms and loading areas contain classified areas where Zone 1 and Zone 2 equipment is required. Distribution partners for Edmonton refineries (Refinery Row) are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Edmonton refineries (Refinery Row) has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Edmonton refineries (Refinery Row): Loading racks, Wastewater treatment, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Edmonton Refinery. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Edmonton winters are cold enough that battery performance and glove use are practical considerations for outdoor work.
Imperial's Strathcona Refinery opened in 1975, employs about 450 people and is reported at roughly 187,000 barrels per day.
Alberta's Industrial Heartland Association was founded in 1998 by Fort Saskatchewan, Lamont County, Strathcona County and Sturgeon County, and Edmonton joined in 2010.
Imperial Oil's Strathcona Refinery, next to Edmonton in Strathcona County, was built in 1975 and is listed at 191,000 barrels a day, producing gasoline, aviation fuel, diesel, lubricating oils, waxes, heavy fuel oil and asphalts.
Of the four upgraders that process mined bitumen, Scotford is the only one not integrated with a mine bitumen plant, so it relies on feedstock supplied from elsewhere.
Sturgeon Refinery, originally designed as a bitumen upgrader, also processes in-situ production from Cold Lake, linking the Edmonton area to heavy-oil supply.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Edmonton refineries (Refinery Row). Classified areas at Edmonton's refineries include process units, crude and product tank farms, loading racks and wastewater treatment, where Zone 1 and Zone 2 equipment is required. The refinery operator classifies each area. A specifier should request that documentation from Imperial Oil or Suncor, not from SAMS.
A distributor for Edmonton refineries (Refinery Row) would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are refinery process units, crude and product tank farms, loading racks, wastewater treatment. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Edmonton refineries (Refinery Row).
Cold winters affect outdoor work, and refineries run planned turnarounds outside peak demand. Dates are operator-set, so ask the operator's contractor team about shutdown windows and which devices are approved for process areas.
Refinery Row in Sherwood Park hosts the Strathcona (Imperial) and Suncor Edmonton refineries, and the Scotford and Industrial Heartland cluster has upgrading and refining capacity. Confirm which operator and site you will visit, because device rules are set per site.
Possibly. Equipment is normally approved by the site operator's HSE or electrical authority, and each operator runs its own process. Imperial Oil and Suncor may ask for different documents or trials. A single manufacturer certificate would help, but ask each operator what it requires before moving a device between sites.
More on Edmonton Refinery, and on other places in Canada.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.