Large operators
Syncrude is owned by a joint venture in which Suncor holds the majority interest, and Suncor, Canadian Natural and Imperial run the major mines.
About 40 percent of oil sands bitumen is upgraded into synthetic crude before sale, mostly from mining operations, with a smaller share from in-situ producers. Hydrocarbon processing and diluent handling create Zone 1 and Zone 2 locations. Distribution partners for Canada's oil sands are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Canada's oil sands has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Canada's oil sands: Diluent and naphtha handling, SAGD facilities, Bitumen extraction and froth treatment | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Canada Oil Sands. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Syncrude is owned by a joint venture in which Suncor holds the majority interest, and Suncor, Canadian Natural and Imperial run the major mines.
Fort McMurray is the commercial and administrative centre of the region and has an international airport with scheduled flights to Edmonton, Calgary, Vancouver and Toronto.
Outside Alberta there are two upgraders in Saskatchewan, the Lloydminster Upgrader and the NewGrade Upgrader, both processing Saskatchewan heavy oil.
Suncor's Upgrader 1 began commercial operation in 1967 at 50,000 bbl/d and was expanded to 110,000 bbl/d in 1998; Upgrader 2 followed in 2001, and expansions in 2005 and 2008 added 240,000 bbl/d.
The Sturgeon Refinery, originally designed as an upgrader, also processes in-situ production from Cold Lake, while the CNOOC Long Lake upgrader is no longer in operation.
The Athabasca, Peace River and Cold Lake oil sands deposits together lie under about 141,000 square kilometres of boreal forest and muskeg in northern Alberta, according to figures attributed to the provincial energy ministry and regulator.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Canada's oil sands. Hydrocarbon processing and diluent handling create Zone 1 and Zone 2 locations, mostly around extraction, upgrading and SAGD facilities. The site operator carries out the classification under its own procedures and the Alberta Safety Codes system. SAMS does not classify areas, so ask for current drawings first.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Canada's oil sands. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are bitumen extraction and froth treatment, upgrader process units, diluent and naphtha handling, sagd facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Canada's oil sands.
Mines mainly have fuel, diluent and froth treatment areas classified, while in-situ sites add steam plants, wellpads and produced gas handling. Upgraders have the widest classified zones. Confirm with each operator which areas need certified devices.
At integrated mines, upgrader and mine plants sit together and share heat, which can make the classified footprint larger and more complex to map. Confirm with the operator the zone drawings for the exact area you will work in.
Normally yes. Equipment is usually approved by the site operator's HSE or electrical authority and bought through its contractor channels. A manufacturer certificate would be one input, not the whole decision. Ask the operator what documents, zone ratings and trial steps it requires before deployment.
Related guides for Canada Oil Sands and for Canada.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.