Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
QatarEnergy · explosion proof

Explosion-Proof Smartphone Supplier for QatarEnergy

The North Field East expansion, signed as an EPC contract with Chiyoda and Technip in February 2021, was planned to lift LNG export capacity from 77 to 110 million tonnes a year. It administers the Ras Laffan and Mesaieed industrial cities and has interests across exploration and production, LNG, refining and petrochemicals. Buyers searching for an explosion proof smartphone supplier for QatarEnergy can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for QatarEnergy, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicexplosion proof
DeviceSmartphone
RouteSupply
WhereQatarEnergy

Short answer. An explosion proof smartphone for QatarEnergy cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.

Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.

At a glance · explosion proof

Checklist: explosion proof smartphone for QatarEnergy

Checks a reviewer should make, with the IS-04Z1 position
CheckWhat to look forIS-04Z1 today
Protection conceptFlameproof (Ex d) or intrinsic safety (Ex i)Intrinsic safety, level ib
Zone suitabilityZone 1 gas and Zone 21 dustDesign target for Zone 1 and 21
CertificateNumber, issuing body and schedule of conditionsIn progress; not issued
Where it appliesQatarEnergy: Petrochemical and fertiliser plants, Onshore oil production, LNG and gas processingClassified by the site operator
Product · Qatar

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Qatar. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The organisation · QatarEnergy

QatarEnergy (formerly Qatar Petroleum): operations and where an Ex phone fits

A short profile of its operations and the kinds of classified area that matter for portable equipment.

Sites and areas

  • Ras Laffan Industrial City
  • Mesaieed Industrial City
  • Dukhan oil field
  • North Field

Classified areas

  • LNG and gas processing
  • Refinery units
  • Petrochemical and fertiliser plants
  • Onshore oil production
Supplier approval · QatarEnergy

Supplier registration at QatarEnergy

QatarEnergy's Supply Management section describes vendor registration through its Mushtaryat Portal, which issues a SAP Vendor Code required for tender documents, and a Projects Preferred Manufacturers List (PML); confirm current requirements with its procurement and HSE teams. The Ex certificate and an organisation's own vendor or engineering approval are two separate timelines; SAMS is working towards both and holds neither today.

Field notes · QatarEnergy

More about QatarEnergy that matters for portable equipment

QatarEnergy: background

Shell employed the first offshore drilling platform in the Eastern Hemisphere east of Qatar in 1955, an early sign of Qatar's long marine oil history that still shapes its offshore fields.

QatarEnergy: background

Qatar took full ownership of the onshore concession in September 1976 and of the offshore concession in February 1977, after a phased nationalisation that began in 1973. The national company dates from 1974.

QatarEnergy: infrastructure

Two refineries operate: the Umm Said refinery at 137,000 barrels a day, and the Laffan refinery at Ras Laffan, which came on stream in September 2009 on field condensate.

QatarEnergy: logistics and access

Offshore crude is piped to Halul Island for processing and export, while most onshore oil goes to Umm Said (Mesaieed) for refining or export, so tank farms and marine loading are central to its operations.

The term · explosion proof

What “explosion proof” means for a smartphone

“Explosion proof” is the phrase most buyers use for equipment that may be taken into a classified hazardous area. Strictly, it covers several protection concepts: a flameproof enclosure (Ex d) contains an internal explosion, while intrinsic safety (Ex i) limits electrical energy so that an ignition cannot start. Phones are normally intrinsically safe, because a flameproof handset would be too heavy to carry all shift.

The IS-04Z1 uses intrinsic safety, with a marking target of Ex ib IIC T4, and is designed for Zone 1 and Zone 21. It is pre-launch, certification is in progress and no certificate has been issued.

In QatarEnergy. LNG liquefaction, refinery units and petrochemical plants use many protection concepts under the name explosion-proof. Flameproof Ex d covers fixed motors and junction boxes, and intrinsic safety suits handhelds. A phone relies on intrinsic safety, with a target marking of II 2 G Ex ib IIC T4, once certified.

The route · supply

Sourcing the IS-04Z1 for QatarEnergy

There is no stock to order for QatarEnergy yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.

  1. 01

    Request the datasheet

    The technical specification, marking target and conditions of use, sent by email.

  2. 02

    Ask for the certification schedule

    Which certificates are in progress, in what order, and what is still to be confirmed.

  3. 03

    Evaluate in a safe area

    Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.

  4. 04

    Register for launch

    Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.

Questions · QatarEnergy

Frequently asked questions

Can QatarEnergy buy the IS-04Z1 today?

Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.

What does an explosion proof smartphone for QatarEnergy cost?

There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.

Is the IS-04Z1 explosion proof or intrinsically safe?

It is intrinsically safe (marking target Ex ib IIC T4), which is the usual way to make a phone for hazardous areas. It is not a flameproof (Ex d) design, and certification is still in progress.

How does QatarEnergy approve suppliers?

QatarEnergy's Supply Management section describes vendor registration through its Mushtaryat Portal, which issues a SAP Vendor Code required for tender documents, and a Projects Preferred Manufacturers List (PML); confirm current requirements with its procurement and HSE teams.

How will SAMS supply QatarEnergy?

Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.

Do QatarEnergy projects such as North Field expansion change supplier requirements?

Large expansion projects are usually run through EPC contractors that apply the operator's specifications, so equipment may be approved by the contractor and the operator together. Ask the project team which standards, certificates and vendor lists apply to the work package before ordering.

Is QatarEnergy a single buyer for all Qatar energy facilities?

QatarEnergy is the national company, but many plants are run by subsidiaries and joint ventures such as the LNG, refining and petrochemical operating companies. Each can have its own HSE rules and supplier registration, so confirm requirements with the operating company that controls the site you will visit.

Would the phone cope with Qatar's heat and humidity at Ras Laffan?

The IS-04Z1 has IP68 dust and water protection and a 4,000 mAh battery. Operating temperature limits will be set by the final certificate and datasheet, so check them against Ras Laffan conditions before use. IP68 is not explosion protection. Confirm the area classification with the site operator.

Enquiry · QatarEnergy

Ask about the IS-04Z1 for QatarEnergy, Qatar

Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.

Enquiry · QatarEnergy

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for QatarEnergy?

Send the zone and gas group of your site and we will reply with the datasheet and schedule.