Eastern location
The base is near Changi Airport and away from the western petrochemical cluster, so work centres on offshore equipment, vessel support and logistics.
The base is described as a self-contained ecosystem, with the operator offering logistics management for offshore oil and gas customers from one location. The 320,000 square metre base combines a 970-metre wharf, workshops, warehouses and hazardous-materials storage supporting offshore oil and gas work. This page explains what to look for in an Ex-proof smartphone for Loyang Offshore Supply Base, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Loyang Offshore Supply Base: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Loyang Offshore Supply Base: Offshore equipment workshops, Hazardous materials storage, Wharf and vessel quay handling | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Loyang Offshore. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The base is near Changi Airport and away from the western petrochemical cluster, so work centres on offshore equipment, vessel support and logistics.
TOPS states that the 970-metre wharf can berth more than 11 vessels at once, including drill ships, semi-submersibles and jack-up rigs.
Security is manned around the clock with strict access requirements and video surveillance, so visitors and contractors should expect pre-registration and screening at the gate.
The Loyang base was redeveloped in 2008 with an investment of about 325 million dollars, turning it into a modern offshore supply facility run by Toll Offshore Petroleum Services.
The surrounding Loyang industrial estate in Pasir Ris mainly hosts aviation-related services because of its closeness to Changi Airport, so visitors will find airport-linked businesses alongside the offshore supply base.
Its wharf can serve more than 11 vessels at the same time, so supply boats and offshore equipment move through the base continuously.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Loyang Offshore Supply Base. Which tenants hold classified areas is not verified, so a marking check at Loyang starts with the tenant. Where chemical and fuel storage is classified, read the zone, gas group and temperature class from that tenant's classification. The IS-04Z1 target marking is II 2 G Ex ib IIC T4.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
Likely candidates are offshore equipment workshops, hazardous materials storage, wharf and vessel quay handling, hot works and afloat repair areas. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
The base is operated by Toll Offshore Petroleum Services, part of Toll Group, and covers 32 hectares in eastern Singapore. Because it is a managed logistics site, tenant and contractor rules are normally set by the operator and by each tenant's own HSE team.
Yes in places: workshops, fuel and chemical stores, and equipment being prepared for offshore service can create classified areas, while the wharf area is mostly open air. The classification varies by building and tenant, so ask the tenant for its zone plan.
Not wholly. The base has workshops, storage and quay handling, and which tenants hold classified areas has not been verified. Chemical and fuel storage may be classified. Ask the tenant's HSE team or the base operator before assuming an Ex rating is required for the task.
More on Loyang Offshore, and on other places in Singapore.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.