Scale
The DEWA Jebel Ali complex has a nameplate capacity of about 8.7 GW, and EGA's Jebel Ali operation comprises a 1 million tonne a year smelter with a 2,350 MW power station.
Jebel Ali, south-west of Dubai, combines the DP World port, the Jebel Ali Free Zone, the DEWA power and desalination complex and the EGA aluminium smelter. Gas-fired power generation, fuel storage and chemical warehousing create classified areas across the district. Distribution partners for Jebel Ali are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Jebel Ali has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Jebel Ali: Smelter power-station fuel areas, Chemical and fuel warehousing, Gas-fired power station fuel systems | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Jebel Ali. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
The DEWA Jebel Ali complex has a nameplate capacity of about 8.7 GW, and EGA's Jebel Ali operation comprises a 1 million tonne a year smelter with a 2,350 MW power station.
Jafza, DP World's flagship free zone, grew from 19 companies in 1985 to over 11,000 today, so access and site rules vary by tenant.
The port has more than one million square metres of container yard and about 960,000 square metres of open storage, so wide open areas are exposed to sun and dust.
With 67 berths, the harbour is described as the world's largest man-made harbour and the biggest port in the Middle East, so jetty and quay areas are extensive.
Jebel Ali Port opened in 1979, inaugurated on 26 February that year to supplement Port Rashid, so much of the district's infrastructure dates from the last 45 years.
The port handled about 13.7 million TEU in 2021, so container, truck and crane traffic is dense and site rules on vehicles and equipment are strict.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Jebel Ali. A marking check at Jebel Ali would compare each tenant's area drawings with the device marking. Smelter power-station fuel areas, oil terminals and chemical warehouses may differ in zone and gas group. The IS-04Z1 target is II 2 G Ex ib IIC T4, in progress and not certified.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Jebel Ali yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
Likely candidates are gas-fired power station fuel systems, desalination and power plant gas supply, smelter power-station fuel areas, chemical and fuel warehousing. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Jebel Ali.
Yes, a refinery adds process units, storage and loading areas, usually with gas classification. ENOC Processing Company runs it, so its own safety and approval rules apply. Contractors should request area classification drawings and the company's equipment requirements before bringing devices in.
The port is about 35 km south-west of Dubai, linked by expressway. Service teams based in the city should allow transfer time and check gate and security procedures, as the port and free zone are controlled areas with their own access passes.
Yes. JAFZA hosts over 8,700 companies, so access and rules vary by tenant, and port, utility and tenant operators set their own approval rules. Ask the operator of the specific site what a phone needs before entering a classified area.
Related guides for Jebel Ali and for United Arab Emirates.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.