With 67 berths, the harbour is described as the world's largest man-made harbour and the biggest port in the Middle East, so jetty and quay areas are extensive. Gas-fired power generation, fuel storage and chemical warehousing create classified areas across the district. Distribution partners for Jebel Ali are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Jebel Ali has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Jebel Ali: Smelter power-station fuel areas, Chemical and fuel warehousing, Gas-fired power station fuel systems | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Jebel Ali. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Hot, humid coastal conditions; outdoor equipment should be rated for heat and salt air.
The DEWA Jebel Ali complex has a nameplate capacity of about 8.7 GW, and EGA's Jebel Ali operation comprises a 1 million tonne a year smelter with a 2,350 MW power station.
Dubai falls under the federal Telecommunications and Digital Government Regulatory Authority, which accepts European documents and renews certificates every three years.
ENOC Processing Company, a subsidiary of the Dubai government's energy group ENOC, runs the Jebel Ali refinery in Dubai, adding a process plant to the port district.
The port has more than one million square metres of container yard and about 960,000 square metres of open storage, so wide open areas are exposed to sun and dust.
Jebel Ali Port opened in 1979, inaugurated on 26 February that year to supplement Port Rashid, so much of the district's infrastructure dates from the last 45 years.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Jebel Ali. Jebel Ali's classified areas include gas-fired power station fuel systems, oil storage terminals, smelter power-station fuel areas and chemical and fuel warehousing. Each operator or tenant classifies its own areas, not SAMS. DEWA's complex and the EGA smelter are both large, with their own power plant arrangements.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Jebel Ali yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are gas-fired power station fuel systems, desalination and power plant gas supply, smelter power-station fuel areas, chemical and fuel warehousing. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Jebel Ali.
Yes, a refinery adds process units, storage and loading areas, usually with gas classification. ENOC Processing Company runs it, so its own safety and approval rules apply. Contractors should request area classification drawings and the company's equipment requirements before bringing devices in.
The port is about 35 km south-west of Dubai, linked by expressway. Service teams based in the city should allow transfer time and check gate and security procedures, as the port and free zone are controlled areas with their own access passes.
Yes. JAFZA hosts over 8,700 companies, so access and rules vary by tenant, and port, utility and tenant operators set their own approval rules. Ask the operator of the specific site what a phone needs before entering a classified area.
Other guides for Jebel Ali, other places in United Arab Emirates, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.