Marine climate
Salt air, heat and humidity are routine, so enclosure ratings and corrosion resistance matter.
Petrobras was created in 1953 with a legal monopoly, and a 1997 law ended that monopoly and set up the national petroleum agency ANP as the regulator and supervisor of the industry. Pre-salt fields supplied 82 per cent of Petrobras production in 2025, so gas-hazard zones exist on process decks and in storage and offloading areas. If you are specifying an Ex-proof mobile phone for Brazilian offshore oil platforms, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Brazilian offshore oil platforms: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Brazilian offshore oil platforms: Oil and gas process modules, Wellhead areas, Gas compression | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Brazil Oil Platforms. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Salt air, heat and humidity are routine, so enclosure ratings and corrosion resistance matter.
New pre-salt units such as FPSO Almirante Tamandare (Buzios) and FPSO Alexandre de Gusmao (Mero) started up in 2025; FPSOs carry a full process plant on deck.
The P-56 project created about 4,000 direct and 12,000 indirect jobs in Brazil, showing the scale of the domestic shipyard and fabrication workforce that supports offshore units.
The semisubmersible P-56 is anchored in 1,670 m of water at the Marlim Sul field, 120 km off the coast, tied back to 21 wells and rated at 100,000 barrels per day with 6 million cubic metres a day of gas compression.
The P-50 platform began production in April 2006 in the Albacora-Leste field of the Campos Basin, a milestone that made Brazil self-sufficient in oil production.
Petrobras describes itself as producing about 2.99 million barrels of oil equivalent a day in 2025, and Brazil accounted for roughly 92 percent of its worldwide production in 2014.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Brazilian offshore oil platforms. Process modules, wellhead areas, gas compression and cargo offloading are Zone 1 environments by their nature on production units. A label check should confirm zone suitability, gas group and temperature class against the unit's classification. The IS-04Z1 marking target II 2 G Ex ib IIC T4 remains a target.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
Likely candidates are oil and gas process modules, wellhead areas, gas compression, cargo tanks and offloading areas. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Local content has been a factor in Petrobras projects; the P-56 topside, for example, reached 72.9 percent domestic content. Handheld equipment is a small part of that, but confirm with the contractor whether any local-content or Brazilian certification requirement applies to your supply.
Typically two layers: conformity assessment for Ex certification (commonly through Inmetro-recognised bodies) and Anatel homologation for radio equipment. Requirements change, so confirm current rules with the operator and a local certification adviser before shipping to a platform.
Equipment and crews move by supply vessel and helicopter, so spares and replacements need planning. Operators control access and often check or prepare devices onshore first. Confirm approvals, documentation and delivery routes with the operator and its contractors.
Other guides for Brazil Oil Platforms, other places in Brazil, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.