FPSO-based fleet
New pre-salt units such as FPSO Almirante Tamandare (Buzios) and FPSO Alexandre de Gusmao (Mero) started up in 2025; FPSOs carry a full process plant on deck.
This is a regional grouping of offshore production platforms and FPSOs in Brazilian waters, mainly in the Campos and Santos basins. Pre-salt fields supplied 82 per cent of Petrobras production in 2025, so gas-hazard zones exist on process decks and in storage and offloading areas. Distribution partners for Brazilian offshore oil platforms are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Brazilian offshore oil platforms has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Brazilian offshore oil platforms: Gas compression, Cargo tanks and offloading areas, Oil and gas process modules | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Brazil Oil Platforms. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
New pre-salt units such as FPSO Almirante Tamandare (Buzios) and FPSO Alexandre de Gusmao (Mero) started up in 2025; FPSOs carry a full process plant on deck.
Equipment and crews move by supply vessel and helicopter, so spares and replacements need planning.
Petrobras was created in 1953 with a legal monopoly, and a 1997 law ended that monopoly and set up the national petroleum agency ANP as the regulator and supervisor of the industry.
The P-56 project created about 4,000 direct and 12,000 indirect jobs in Brazil, showing the scale of the domestic shipyard and fabrication workforce that supports offshore units.
The semisubmersible P-56 is anchored in 1,670 m of water at the Marlim Sul field, 120 km off the coast, tied back to 21 wells and rated at 100,000 barrels per day with 6 million cubic metres a day of gas compression.
The P-50 platform began production in April 2006 in the Albacora-Leste field of the Campos Basin, a milestone that made Brazil self-sufficient in oil production.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Brazilian offshore oil platforms. Process modules, wellhead areas, gas compression and cargo offloading are Zone 1 environments by their nature on production units. A label check should confirm zone suitability, gas group and temperature class against the unit's classification. The IS-04Z1 marking target II 2 G Ex ib IIC T4 remains a target.
A distributor for Brazilian offshore oil platforms would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
Likely candidates are oil and gas process modules, wellhead areas, gas compression, cargo tanks and offloading areas. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Brazilian offshore oil platforms.
Typically wellhead, process, gas compression, separator and some tank and drilling areas, along with parts of the helideck fuel area. Exact zones, gas groups and temperature classes come from the platform's classification drawings, so confirm them with the operator before taking a device out.
Rules are set by the operator and are usually strict: personal devices are often restricted to accommodation areas, and field devices normally must hold certification for the relevant zone. Check the induction material and ask the safety team which devices are permitted in each area.
Each operator, including Petrobras, Prio, Shell, Trident Energy, Brava Energia and Perenco, applies its own rules on portable devices and approvals. Ask each one for its Ex equipment policy rather than assuming a common standard applies. Confirm with the site operator before any order.
Related guides for Brazil Oil Platforms and for Brazil.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.