Dispersed sites
The play extends through areas around Fort St. John and Dawson Creek in British Columbia and into Alberta, so facilities are spread over a wide area.
The Montney Formation covers about 130,000 square kilometres of British Columbia and Alberta and is a major shale gas and tight oil resource. Wellpads, compressor stations and gas plants across it contain classified areas. This page explains what to look for in an ATEX and IECEx smartphone for Montney gas play, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Montney gas play: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Montney gas play: Wellpads and wellheads, Gas processing plants, Compressor stations | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Montney Gas Field. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
The play extends through areas around Fort St. John and Dawson Creek in British Columbia and into Alberta, so facilities are spread over a wide area.
ARC Resources has described Attachie near Fort St. John producing more than 30,000 barrels of oil equivalent per day, including condensate.
A 2013 joint study by the National Energy Board, the BC Oil and Gas Commission and the Alberta Energy Regulator assessed the formation, and gas is produced in both provinces, so operators work under two regimes.
In northeast British Columbia some wells contain hydrogen sulphide, which makes gas sour, flammable and potentially deadly if inhaled, and Geoscience BC research maps where it occurs in unconventional reservoirs.
The Montney is a Lower Triassic unit of dolomitic siltstone and sandstone up to about 280 m thick, which supports long horizontal wells.
The Montney Formation was first described in 1962 from Texaco's Buick Creek No. 7 well, drilled 41 km north of Fort St. John immediately east of the Alaska Highway.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Montney gas play. A reviewer for a Montney producer, such as ARC Resources or Progress Energy Canada, would expect certificate evidence suited to wellpads, compressor stations and gas plants. A dual ATEX and IECEx route helps international partners in the ownership chain. The IS-04Z1 is in certification and no certificate has been issued.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are wellpads and wellheads, gas processing plants, compressor stations, condensate handling. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Hydrogen sulphide is a toxic hazard rather than an Ex rating, but sour sites add gas detection, breathing apparatus and rules for devices. Confirm requirements with the operator's induction team and ensure your device meets zone and gas group needs.
Typically wellpads, gas gathering, compressor stations and gas plants with flammable natural gas, and some sites with condensate or sour gas. Classified areas vary by facility, so request the operator's classification drawing before bringing equipment.
Yes, gas from the Montney supplies LNG Canada through the Coastal GasLink pipeline. That link does not change the area classification at a wellpad, which the producing operator decides. A handset would still need to match the zone, gas group and temperature class assigned for that location. Ask the operator for the area data.
Other guides for Montney Gas Field, other places in Canada, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.