Repsol Polímeros runs the olefins and polymer complex at Sines, which has just been expanded, and this page is for the process safety, instrumentation and telecoms teams deciding what an explosion proof mobile phone has to be in Portugal's plastics industry. The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, with certification in progress ahead of a Q4 2026 launch.

Launching Q4 2026 · certification programme in progress

SAMS IS-04Z1 explosion proof mobile phone, front view
Local approvalATEXATEX 2014/34/EU · Decreto-Lei 111-C/2017 · in progress
AvailabilityQ4 2026via authorised distributors
The site · Sines

Explosion proof mobile phone for the Repsol Sines polymer complex: what is classified

Repsol has expanded its Sines industrial complex with two new plants, one for linear polyethylene and one for polypropylene, each described in the trade press as a capacity of 300,000 tonnes a year. The company has said the plants were due to start in late 2025 and reach full capacity in 2026, and that they integrate photovoltaic power and electrolysis hydrogen. A polymer plant has both hazards in one place: ethylene, propylene and hydrogen in the reaction and recovery sections, and fine polymer powder and pellets in the downstream silos and extruders. That is the textbook case for Zone 1 and Zone 21 in the same building.

Process areas

Olefins feed and recovery
Ethylene and propylene handling, including group IIB and IIC service lines.
Polymerisation reactors
Pressurised reactors with hydrocarbon diluents and hydrogen as a chain-transfer agent.
Degassing and recovery
Removing unreacted hydrocarbon from the polymer and recycling it.
Powder silos and conveying
Polymer powder transferred by air, with dust clouds and static to manage.
Extrusion and pelletising
Hot melt, cooling water and pellet transport and bagging.
Warehouse and dispatch
Bagged and bulk product loading for road and port.

People and contractors

Repsol operations
Control-room and field operators on a continuous shift pattern.
Project and commissioning crews
Start-up of new plants uses specialists from licensors, contractors and vendors.
Maintenance contractors
Rotating equipment, electrical and instrument crews for turnarounds.
Hauliers and port staff
Product leaves in bulk and bags towards customers and the Sines port.
Neighbouring operators
See explosion proof phone for Galp for the refinery, and explosion proof phone for REN Atlântico for the LNG terminal.
Estate services
Shared utilities, fire cover and security across the Sines estate.
Built for local conditions

What a polymer plant does to a handset

A polymer complex asks for a single device that works in two hazard types at once. That is where a gas-only handset fails and a Zone 1 and Zone 21 design earns its place.

Powder and gas in one building

Reactors and recovery sections are gas areas, while the silo and extrusion floors are dust areas, sometimes within a few metres of each other. A handset designed for both Zone 1 and Zone 21 avoids leaving one at the door and carrying another inside.

Static and cleaning

Polymer dust and plastic surfaces build static, and dust layers need removing on a cleaning schedule. A sealed IP68 body is easier to wipe down than a case with open ports, though the operator's cleaning procedure takes priority.

Start-up of a new plant

A new line brings dozens of commissioning staff who are unfamiliar with the plant. A managed handset carrying the area map, the permit application and a call directory shortens their orientation.

Records at the point of work

Round sheets, photographs of seals and positions of leaks can be captured with the 50 MP camera and GNSS and uploaded into the maintenance system through the plant's own mobile device management.

Use cases

Where the IS-04Z1 would be used at Sines

Operations01

Reactor and recovery area rounds

Operators check pumps, seals and relief systems in hydrocarbon service. A handset with an alarm application and a photographic record replaces separate radio and camera equipment.

Solids handling02

Silo, conveying and extrusion checks

Blocked lines and hot spots in powder handling are classic dust-fire precursors. A Zone 21 device allows staff to photograph and report a problem without walking out of the dust area.

Turnaround03

Planned stop and new-plant commissioning

Large contractor crews need access during a stop. Enrolling devices in advance and wiping them afterwards is easier with a single approved model.

Approvals and access

What Repsol's HSE and procurement teams will ask for

A polymer plant like this will want the ATEX certificate covering both the gas and dust categories, the temperature class and, for dust, the maximum surface temperature. We have not verified any Repsol vendor-registration programme and name none; ask the Sines procurement and HSE teams what a supplier of electrical equipment must supply and what induction contractors must complete.

SAMS has no customer or supply relationship with Repsol, and the IS-04Z1 has no certificate yet. Evaluation units are for assessment and training, not for use in classified areas.

Questions

Frequently asked questions

Why does a polymer plant need Zone 21 as well as Zone 1?

Because the process is gas in the front end and powder in the back end. Polymer powder suspended in air can burn violently, so silos, conveyors and bag-handling areas are classified for dust, and a gas-only phone would not be suitable there.

Does hydrogen at the plant change the gas group?

Yes, it pushes the requirement to group IIC. The IS-04Z1 is designed to Ex ib IIC T4 as a marking target, so hydrogen areas are inside the design intent.

Can the same handset serve both Repsol and neighbouring operators?

Technically yes, since the certificate follows the device. Each operator still decides for itself whether to accept it, so ask each one separately.

Enquiry · Repsol Polimeros

Ask about the IS-04Z1 for Repsol Polimeros, Portugal

Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for Portugal. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.

Enquiry · Repsol Polimeros

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter a valid phone number.
Please enter your target market.
Please select one.

Launching Q4 2026

Evaluating the IS-04Z1 for this site?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.