Dust gets into everything
In a mill or cement plant, fine powder settles on every surface and works into seams. IP68 sealing keeps it out of the housing, and a dust-rated device also means a layer on the surface does not become the ignition problem.
Estarreja chemistry, the Navigator pulp mills and the Secil and Cimpor cement works are the places where an explosion proof mobile phone in Portugal has to cope with gas and dust together. This page is for the HSE and maintenance leads at those sites. The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, with certification in progress ahead of a Q4 2026 launch.
Launching Q4 2026 · certification programme in progress
Three industries, three different hazards. At Estarreja, chlor-alkali and organic chemistry bring hydrogen and flammable liquids; see explosion proof phone for Bondalti. Navigator runs pulp and paper mills at Figueira da Foz, Setúbal and Aveiro, with recovery boilers, lime kilns, biomass handling and wood dust. Secil and Cimpor operate cement plants where coal, petcoke and alternative fuels are ground and fed to kilns. Gas areas are the main concern in the chemicals, while dust areas decide the outcome in the mills and cement works.
A device for this sector has to survive airborne fibre, cement dust and wet cleaning while remaining legal in both gas and dust areas.
In a mill or cement plant, fine powder settles on every surface and works into seams. IP68 sealing keeps it out of the housing, and a dust-rated device also means a layer on the surface does not become the ignition problem.
A pulp mill has a fuel farm, a solvent store and a wood yard within the same fence. One Zone 1 and Zone 21 handset covers the full walk, instead of two devices with two sets of rules.
Kiln lines and recovery boilers are loud, tall and spread out. Four-constellation GNSS gives a position, and the 4,000 mAh battery is specified to last a shift without any recharge in the classified area.
Shutdown crews move between pulp mills, cement plants and chemical sites. A device whose certificate follows the person lowers the paperwork each time, though each operator still decides separately.
Operators check conveyors, feeders and fuel lines in areas where fibre dust and flammable gas are both possible. A managed handset records the round and flags a hot spot with a photograph.
Fuel milling is the most sensitive dust task on a cement site. A Zone 21 device lets maintenance staff report a blocked line or a hot bearing from the place it happens.
In chemical plants, hydrogen and solvents are the ignition hazards, and chlorine is the toxic one. A single device helps crews at Estarreja report faults while observing the access rules for the toxic areas.
Each operator keeps its own contractor and equipment approval process, and we name none of them. The usual documents are the ATEX certificate for the device, the marking with its gas and dust categories, the temperature class, the maximum surface temperature for dust and a statement on servicing. Ask the procurement and HSE team at each site what they need before a new device type is allowed in. Sites handling hydrogen or methane should also look at explosion proof phone for hydrogen and LNG at Sines.
The IS-04Z1 is pre-launch and no certificate has been issued, so no unit is supplied for use in a classified area before the certificate covering that use exists.
Both appear, but the wood yard, bark and biomass fuel and lime handling are classically dust. The gas risk comes from fuel gas, solvents and black liquor vapours, so a Zone 1 and Zone 21 device is the right basis.
Cement and raw meal are largely non-combustible. The risk comes from the fuel side, such as coal and petcoke, plus waste-derived fuels. The classification is made area by area, and the operator's explosion protection document decides it.
The certificate belongs to the device, so it can be listed in more than one operator's file. Each operator still has to accept it, so contact each site separately.
Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for Portugal. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.