IIC is the safe choice
A device certified to group IIB would be excluded from a hydrogen area. The IS-04Z1 marking target is Ex ib IIC T4, so that choice does not need revisiting if a methane site becomes a hydrogen site.
Sines is where Portugal's LNG arrives, where its largest green hydrogen projects are being built and where new industrial land is being let, which makes it a busy place for an explosion proof mobile phone. This page is for project and operations teams across the estate. The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, with certification in progress ahead of a Q4 2026 launch.
Launching Q4 2026 · certification programme in progress
The port, the ZILS industrial and logistics zone and the surrounding plants form one of Portugal's densest energy sites. The LNG terminal receives carriers at a single jetty; see explosion proof phone for REN Atlântico. Galp is installing a 100 MW electrolyser at its refinery, which press reports say is due to enter operation in the second half of 2026; see explosion proof phone for Galp. A separate 10 MW electrolyser at the port was awarded to RCT Hydrogen under the Green Hydrogen Sines project. Alongside them sit the Repsol polymers plants and a planned large data campus, so the estate mixes methane, hydrogen, diesel and battery rooms.
New plants mean new classified areas, small commissioning teams and very little local history of which devices work. Group choice matters more than usual.
A device certified to group IIB would be excluded from a hydrogen area. The IS-04Z1 marking target is Ex ib IIC T4, so that choice does not need revisiting if a methane site becomes a hydrogen site.
A new electrolyser or terminal extension is commissioned by a handful of specialists from several vendors. A managed handset, enrolled once, gives them the permit, the P and ID drawings and a call list on a single device.
Sines is an open coastal site. IP68 sealing and four-constellation GNSS are suited to wind, rain and large distances, and the 4,000 mAh battery covers a shift.
New plants write their explosion protection documents from scratch. Receiving the marking string, gas group and temperature class early lets engineers record the handset in the first issue.
Cell stacks, dryers and compressors are brought into service in stages. Commissioning staff photograph, log and call in from inside a group IIC area.
Terminal staff and surveyors work across a large open site under permit. A managed handset holds the permit, logs the round and reports position.
Fire teams, electricians and inspectors visit several operators in one shift. One handset that each operator can review reduces the mixed-phone problem at the gates.
Each operator at Sines applies its own contractor and equipment approval, and we have not verified a shared programme. Ask each site's procurement and HSE teams what documents, induction and testing they require. For the refinery and polymer sites see explosion proof phone for refining, polymers and fuels; the main product documents are the ATEX certificate, the marking, the temperature class and a servicing statement.
Press reports about project timings are not confirmed here, and teams should check dates with the project owners. The IS-04Z1 has no certificate yet, so nothing is supplied for use in a classified area until it exists.
Hydrogen has a very low minimum ignition energy and is placed in group IIC. Equipment certified for IIB cannot be used in a hydrogen atmosphere, so IIC is the only workable choice.
Mostly no. Data halls are not classified in the usual way. The classified spots are fuel stores, some battery rooms and any hydrogen systems, so only those staff would need an Ex device.
We cannot confirm dates. The statement that the Galp electrolyser should enter operation in the second half of 2026 comes from press reports, so check it with the project owner.
Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for Portugal. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.