Two sites, two kinds of hazard
A phone used at Pernis for gas may be carried to Moerdijk where dust is present. A Zone 1 and Zone 21 design target means one handset rather than two, and the certificate will show which marking applies.
Shell Nederland runs its largest Dutch industrial footprint at Pernis, on the Nieuwe Maas in Rotterdam, with a chemical site at Moerdijk linked to it by pipeline. This page is for HSE officers, instrumentation engineers and telecoms teams who need an explosion proof mobile phone for work across those two sites in the Netherlands, and who want to know what to put in front of the site’s equipment reviewers. The IS-04Z1 is designed around intrinsic safety rather than a flameproof enclosure.
Launching Q4 2026 · certification programme in progress
Pernis is the Shell Energy and Chemicals Park Rotterdam, a refinery and chemicals complex in the Pernis area of the Rotterdam port, and Moerdijk is a separate chemical site on the Hollands Diep inland port, with the two connected by pipeline. They are different hazard profiles. Pernis is a refinery in the traditional sense, with hydrocarbon vapour, hydrogen circuits and large tank farms. Moerdijk is a chemicals plant, with olefins and their derivatives handled as gas and liquid at pressure. Wherever solids are handled, Zone 21 dust can appear alongside Zone 1 gas, and the Dutch zoning practice for them runs on NPR 7910-1 and NPR 7910-2.
Both sites are exposed, busy and policy-heavy. These are the conditions that decide whether a handset is workable once the zone question is answered.
A phone used at Pernis for gas may be carried to Moerdijk where dust is present. A Zone 1 and Zone 21 design target means one handset rather than two, and the certificate will show which marking applies.
Pernis and Moerdijk are open industrial sites on Dutch rivers and canals. IP68 sealing and rugged build cover rain, hosing and the knocks of daily use.
Contractors on a stop work long shifts away from a charger. The 4,000 mAh battery is specified to cover a full shift with the camera in use.
Android Enterprise enrolment means the site’s own team applies camera and application policy centrally, rather than depending on each user to follow it.
A stop at Pernis or Moerdijk brings in a contractor population that changes weekly. A single managed handset carries the job pack and the sign-off, and leaves the site with the device rather than with the paper.
Operators walk fixed routes between units, taking readings and photographs. The same handset that records the reading can send a position and a voice message without a trip to a safe area.
Product moves between Pernis and Moerdijk by pipeline and other routes. Teams checking a transfer need a phone that works at the pipeline interface and at the destination, not one tied to a single building.
We cannot verify the details of Shell’s own supplier or contractor registration steps for these sites, so we do not describe them. The route is to ask Shell Nederland’s procurement and HSE teams what they require. Below is what an operator of this kind typically wants, and what the IS-04Z1 programme is preparing.
Not that we have verified. Operators generally set equipment rules in their own HSE standards, which are shared with approved suppliers rather than published. Ask the site’s procurement and HSE teams.
Wherever a chemical site handles solids, dust comes into the picture. A device for Moerdijk has to be considered for Zone 21 as well as the gas zones, which is why the Zone 21 design target is part of the programme.
That is the aim. The marking string, once issued, shows which zones and gas group the certificate covers, and the engineers at each site decide whether it fits their zoning.
Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for Netherlands. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.