Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
Netherlands · Dow Benelux

Explosion proof mobile phone for Dow Benelux in the Netherlands

Dow’s Terneuzen site, on the canal between Terneuzen and Ghent in Zeeland, is the largest Dow production site outside the United States. This page is for the HSE officers, instrumentation engineers and telecoms teams at a site of that kind who need an explosion proof mobile phone in the Netherlands, and want to know how gas and dust areas shape the choice of handset. The IS-04Z1 is designed around intrinsic safety rather than a flameproof enclosure.

Launching Q4 2026 · certification programme in progress

SAMS IS-04Z1 explosion proof mobile phone, front view
Local approvalATEXATEX 2014/34/EU · Warenwetbesluit explosieveilig materieel 2016 · in progress
AvailabilityQ4 2026via authorised distributors
The site · Terneuzen

What is classified at Dow’s Terneuzen site

Terneuzen is an integrated chemical complex: steam crackers making ethylene and propylene at the front, and a long chain of derivative plants behind them, including polyethylene and other polymers, polyols and intermediates. That mix is what makes it a good test for a handset. Flammable gas and liquid sit in the cracker and the derivative units, while polymer powder and pellet handling brings combustible dust into the same estate. The zoning for each unit lives in the site’s explosieveiligheidsdocument and is owned by the operator. What follows describes the kinds of areas such a site contains, not Dow’s own zone drawings.

Who is on the fence

Dow operations
Outside operators and panel operators on continuous shifts across cracker, derivative and utilities units.
Contractors
Maintenance and inspection firms, including Dutch turnaround contractors, working under site permits.
Neighbouring industry
Other companies along the Ghent to Terneuzen canal share roads, utilities and emergency planning with the Dow site.
Port and logistics
Ships, barges, rail and road tankers loading and unloading at the canal and the terminals.
Authorities
Nederlandse Arbeidsinspectie and the regional environment and safety bodies, which inspect major-hazard sites together.

Classified units and areas

Steam crackers
Ethylene, propylene and other hydrocarbons at pressure, with furnaces and compressors alongside.
Derivative plants
Polymers and intermediates with flammable monomers, solvents and process gases.
Polymer powder and pellet handling
Reactors discharging powder, silos, conveying and bagging, where Zone 21 dust applies.
Tank farms and loading
Storage and ship, barge and rail loading points for liquids and liquefied gases.
Utilities and pipe racks
Hydrogen, nitrogen and fuel gas distribution across a large estate.
Control rooms and offices
Safe areas, where handsets are checked in and charged.
Built for local conditions

Explosion proof mobile phone conditions at Terneuzen, in the Netherlands

A site this size is mostly a matter of distance, weather and mixed hazards. These are the conditions that matter when the zone question has been answered.

IP ratingIP68
Battery4,000 mAh
Camera50 MP
OSAndroid 16

Gas and dust in one walk

An operator can pass from a gas zone at a cracker to a dust zone in polymer handling in a few hundred metres. A Zone 1 and Zone 21 design target means the same handset covers both, subject to the marking on the certificate.

A large estate with open walking distances

Routes between units are long and charging is outside the classified boundary. The 4,000 mAh battery is specified to cover a full shift, and four-constellation GNSS gives a position on a site with few landmarks.

Canal-side weather

Terneuzen is flat, open and damp. IP68 sealing and rugged build are aimed at rain, hosing and handling rather than desert dust.

Camera under control

Photography is controlled on a major-hazard site. Android Enterprise lets the operator set camera and application policy from its existing console and show that it is applied.

Work here · Terneuzen

How the work is organised at Terneuzen

Turnaround01

Planned stops and the idle-unit question

Dow has publicly postponed a planned turnaround on one of the Terneuzen crackers, according to trade press reports, which shows that the stop calendar shifts with market conditions. A managed handset needs to be ready for a stop at short notice rather than on a fixed date.

Operations02

Rounds across mixed gas and dust areas

An operator’s round can cross several classifications. One handset that records readings, takes a photograph and sends a position avoids switching devices at a zone boundary.

Contractors03

Short-term crews with site permits

Contractors on a polymer or cracker job work to a permit issued that morning. An enrolled handset carries the permit and the site directory, and can be wiped at the end of the contract.

Access · Dow Benelux

What the site would ask a supplier for

We have not verified the details of Dow’s own supplier or contractor registration for Terneuzen and do not describe them. The route is to ask Dow Benelux’s procurement and HSE teams what they require. The list below is what a Dutch chemical site typically wants in front of it, and what the IS-04Z1 programme is preparing.

Documents to prepare

Marking and certificate
The full ATEX marking string and certificate number, once issued, for the equipment selection reasoning in the explosieveiligheidsdocument.
Dust evidence
Confirmation of the Zone 21 scope in the certificate, since dust is a separate part of the zoning to gas.
Dutch documentation
Manual, safe-use instructions and declaration of conformity in Dutch.
Management and service
An enrolment guide for the existing MDM, and a service route for an intrinsically safe device.
Questions · Dow Benelux

Frequently asked questions

Does Dow’s Terneuzen site need both gas and dust protection?

A site with crackers and polymer handling can have both, which is why the Zone 1 and Zone 21 design target applies. The certificate and the site’s own zoning decide where the handset may go.

How does a handset fit with existing radios?

Many sites use radios for voice, and a smartphone adds data, camera and position. Whether it replaces or complements radios is an operational decision for the site.

Can a handset be issued to contractors?

That is for the operator to decide. A managed device that can be enrolled for the duration of a contract and wiped afterwards is easier to admit than a personal device.

Enquiry · Dow Benelux

Ask about the IS-04Z1 for Dow Benelux, Netherlands

Tell us the site, the zone and gas group, and roughly how many handsets. The SAMS team replies by email with the datasheet and the certification schedule for Netherlands. The IS-04Z1 is pre-launch and certification is in progress, so there is no list price yet; indicative pricing is issued in writing against a stated quantity and site.

Enquiry · Dow Benelux

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter a valid phone number.
Please enter your target market.
Please select one.

Launching Q4 2026

Evaluating the IS-04Z1 for this site?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule for your market.