Power stations
Ballylumford, owned by EP UK Investments since 2019, is the region's largest power station and runs on natural gas. Coolkeeragh near Derry is a 400 MW gas-fired plant owned by ESB.
Northern Ireland is a UK region with gas-fired power stations, the Scotland-Northern Ireland gas pipeline landing at Islandmagee and a proposed gas storage cavern project there. Zone 1 work arises at power stations, gas transmission assets and fuel storage. Distribution partners for Northern Ireland are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Northern Ireland has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP65 to IP68 sealing | IP68 design |
| Drop and shock | A stated drop height onto concrete | Specification on request |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Northern Ireland: Gas pressure reduction sites, Fuel storage, Gas-fired power station fuel systems | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Northern Ireland. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Ballylumford, owned by EP UK Investments since 2019, is the region's largest power station and runs on natural gas. Coolkeeragh near Derry is a 400 MW gas-fired plant owned by ESB.
Mutual Energy owns the Scotland-Northern Ireland pipeline, the Belfast gas transmission pipeline from Islandmagee, and the Moyle electricity interconnector.
The electricity grid is operated by SONI and run by Northern Ireland Electricity, connected to the Republic by interconnectors of up to 1,200 MW and to Great Britain by the 500 MW Moyle interconnector.
Machinery and equipment manufacturing, food processing, textile and electronics manufacturing are the leading industries, concentrated mostly in the eastern parts of Northern Ireland around Belfast.
The Belfast yard has sea access through the Victoria Channel with no locks or height restrictions, 24-hour ISPS-approved security, and two airports close by: George Best Belfast City five minutes away and Belfast International under 30 minutes.
Key industries in 2024 include aerospace, agriculture, construction, engineering, health technology and manufacturing, and engineering is the largest manufacturing sub-sector, particularly aerospace and heavy machinery.
A rugged phone is built to survive water, dust, drops and rough handling, usually rated by an IP code and a drop specification. Ruggedness is an environmental property: it says nothing about whether a phone may be used where flammable gas or dust is present. That is decided by explosion-protection certification and marking.
The IS-04Z1 combines both: an IP68 sealed rugged build and a design for Zone 1 and Zone 21 (marking target Ex ib IIC T4). The explosion-protection certificates are in progress and none has been issued.
In Northern Ireland. Northern Ireland's climate is cool, wet and windy, with frequent rain and damp at coastal sites such as Islandmagee. These conditions suit a device with an IP68 rating for water and dust. IP68 is not explosion protection, and it does not substitute for the certification still in progress.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Northern Ireland yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
It is designed to IP68 sealing, with glove-friendly controls. Ruggedness is not explosion protection: that depends on the certificates, which are in progress.
Likely candidates are gas-fired power station fuel systems, gas transmission pipeline assets, gas pressure reduction sites, fuel storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Northern Ireland.
Northern Ireland remains under EU product rules for many goods, so CE and ATEX marking is generally relevant there, while Great Britain uses UKCA. Requirements can change, so confirm with the operator and the certifying body which marking is accepted for portable Ex equipment on your site.
Likely locations include fuel and gas terminals at Belfast harbour, gas network compressor and pressure reduction sites, food and feed plants with dust risks, and shipyard and marine repair work. Zoning is site-specific, so ask the operator for area classification drawings before choosing handheld devices.
Gas-fired power stations such as Ballylumford and Coolkeeragh, the Mutual Energy gas pipeline network from Islandmagee, pressure reduction sites and fuel storage. A proposed gas storage cavern project at Islandmagee has not been confirmed in the sources checked, so ask the operators about project timing.
Other guides for Northern Ireland, other places in United Kingdom, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.