Special economic zone
The Mangalore SEZ covers about 1,600 acres, 15 km from the city off NH 66, and houses OMPL, a petrochemical unit with about 1 million tonnes a year of paraxylene capacity.
Mangaluru is a port city in Karnataka with the 15 million tonne MRPL refinery at Katipalla, a petrochemical unit in the adjoining Mangalore Special Economic Zone, and an Indian strategic crude storage cavern. ONGC held about 71.6 percent of MRPL and HPCL about 17 percent as of 2020, so the refinery sits inside the public-sector oil group. Distribution partners for Mangaluru (Mangalore), Karnataka are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Mangaluru (Mangalore), Karnataka has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Mangaluru (Mangalore), Karnataka: Underground crude storage caverns, Marine terminal, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Mangalore India. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The Mangalore SEZ covers about 1,600 acres, 15 km from the city off NH 66, and houses OMPL, a petrochemical unit with about 1 million tonnes a year of paraxylene capacity.
India's strategic petroleum reserve includes a 1.5 million tonne underground facility at Mangaluru, with a further one at nearby Padur.
The international airport is about 15 kilometres from the city centre and the city's average elevation is 22 metres above sea level.
It has two hydrocrackers for premium diesel, two continuous catalytic reformers for high-octane petrol and a 0.44 million tonne polypropylene unit.
Mangaluru lies between the Arabian Sea and the Western Ghats, 352 kilometres west of Bengaluru and 297 kilometres south of Goa, and has all four modes of transport.
MRPL, established in 1988 at Katipalla north of Mangaluru, has a design capacity of 15 million tonnes a year and processes crudes of 24 to 46 API gravity, light to heavy and sour to sweet.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Mangaluru (Mangalore), Karnataka. Inspection rounds across refinery process units, petrochemical aromatics and polypropylene units, and cavern pumping areas are repetitive and spread widely. An intrinsically safe handheld supports logging in place. The IS-04Z1 is designed for this kind of work, subject to certification still in progress.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Mangaluru (Mangalore), Karnataka. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
Likely candidates are refinery process units, petrochemical aromatics and polypropylene units, underground crude storage caverns, marine terminal. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Mangaluru (Mangalore), Karnataka.
Humidity averages about 75 percent and peaks at around 93 percent in July, with 95 percent of rain falling between May and September. Choose sealed devices and ask about corrosion resistance for coastal air.
It has air, road, rail and sea links, with the international airport about 15 kilometres from the centre and a major port. Freight is normally straightforward, but confirm customs and gate arrangements.
They can. Cavern access and pumping areas have their own classification and entry rules, separate from refinery process units. Confirm with the operator of the strategic reserve which devices are allowed, under what permit, and who approves them.
Related guides for Mangalore India and for India.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.