Special economic zone
The Mangalore SEZ covers about 1,600 acres, 15 km from the city off NH 66, and houses OMPL, a petrochemical unit with about 1 million tonnes a year of paraxylene capacity.
Mangaluru is a port city in Karnataka with the 15 million tonne MRPL refinery at Katipalla, a petrochemical unit in the adjoining Mangalore Special Economic Zone, and an Indian strategic crude storage cavern. Humidity averages about 75 percent and peaks at around 93 percent in July, with a lowest average of about 56 percent in January. Distribution partners for Mangaluru (Mangalore), Karnataka are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Mangaluru (Mangalore), Karnataka has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Mangaluru (Mangalore), Karnataka: Underground crude storage caverns, Marine terminal, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Mangalore India. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The Mangalore SEZ covers about 1,600 acres, 15 km from the city off NH 66, and houses OMPL, a petrochemical unit with about 1 million tonnes a year of paraxylene capacity.
India's strategic petroleum reserve includes a 1.5 million tonne underground facility at Mangaluru, with a further one at nearby Padur.
The international airport is about 15 kilometres from the city centre and the city's average elevation is 22 metres above sea level.
It has two hydrocrackers for premium diesel, two continuous catalytic reformers for high-octane petrol and a 0.44 million tonne polypropylene unit.
Mangaluru lies between the Arabian Sea and the Western Ghats, 352 kilometres west of Bengaluru and 297 kilometres south of Goa, and has all four modes of transport.
MRPL, established in 1988 at Katipalla north of Mangaluru, has a design capacity of 15 million tonnes a year and processes crudes of 24 to 46 API gravity, light to heavy and sour to sweet.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Mangaluru (Mangalore), Karnataka. The refinery and the SEZ petrochemical unit sit apart, about 15 km separating the zone from the city, so fleets run across several sites. MDM or EMM enrolment, which the IS-04Z1 supports, helps maintain control. Charging stays in safe areas such as control rooms.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Mangaluru (Mangalore), Karnataka. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are refinery process units, petrochemical aromatics and polypropylene units, underground crude storage caverns, marine terminal. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Mangaluru (Mangalore), Karnataka.
Humidity averages about 75 percent and peaks at around 93 percent in July, with 95 percent of rain falling between May and September. Choose sealed devices and ask about corrosion resistance for coastal air.
It has air, road, rail and sea links, with the international airport about 15 kilometres from the centre and a major port. Freight is normally straightforward, but confirm customs and gate arrangements.
They can. Cavern access and pumping areas have their own classification and entry rules, separate from refinery process units. Confirm with the operator of the strategic reserve which devices are allowed, under what permit, and who approves them.
More on Mangalore India, and on other places in India.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.