Refinery
MRPL was established in 1988, is a subsidiary of ONGC and has a design capacity of 15 million tonnes a year, including a polypropylene unit.
Mangaluru is a port city in Karnataka with the 15 million tonne MRPL refinery at Katipalla, a petrochemical unit in the adjoining Mangalore Special Economic Zone, and an Indian strategic crude storage cavern. These create hazardous areas in processing and storage. Distribution partners for Mangaluru (Mangalore), Karnataka are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Mangaluru (Mangalore), Karnataka has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Mangaluru (Mangalore), Karnataka: Underground crude storage caverns, Marine terminal, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Mangalore India. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
MRPL was established in 1988, is a subsidiary of ONGC and has a design capacity of 15 million tonnes a year, including a polypropylene unit.
The Mangalore SEZ covers about 1,600 acres, 15 km from the city off NH 66, and houses OMPL, a petrochemical unit with about 1 million tonnes a year of paraxylene capacity.
The new port opened in 1968, handles about 75 percent of India's coffee and cashew exports and is India's seventh-largest container port.
ONGC held about 71.6 percent of MRPL and HPCL about 17 percent as of 2020, so the refinery sits inside the public-sector oil group.
The international airport is about 15 kilometres from the city centre and the city's average elevation is 22 metres above sea level.
It has two hydrocrackers for premium diesel, two continuous catalytic reformers for high-octane petrol and a 0.44 million tonne polypropylene unit.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Mangaluru (Mangalore), Karnataka. MRPL, OMPL and the strategic reserve each use specialist contractors, some of them international. IECEx evidence, meaning a certificate of conformity with its schedule of conditions, is a reference they commonly recognise. SAMS is pursuing IECEx for the IS-04Z1, and nothing has been issued.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Mangaluru (Mangalore), Karnataka yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are refinery process units, petrochemical aromatics and polypropylene units, underground crude storage caverns, marine terminal. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Mangaluru (Mangalore), Karnataka.
Humidity averages about 75 percent and peaks at around 93 percent in July, with 95 percent of rain falling between May and September. Choose sealed devices and ask about corrosion resistance for coastal air.
It has air, road, rail and sea links, with the international airport about 15 kilometres from the centre and a major port. Freight is normally straightforward, but confirm customs and gate arrangements.
They can. Cavern access and pumping areas have their own classification and entry rules, separate from refinery process units. Confirm with the operator of the strategic reserve which devices are allowed, under what permit, and who approves them.
Related guides for Mangalore India and for India.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.