Canada: background
The Great Canadian Oil Sands plant, now part of Suncor, opened in 1967, and Fort McMurray's growth took off as further oil sands plants followed after the 1970s energy crises.
The IS-04Z1 is an Ex phone for people working inside classified areas at Canadian oil sands plants, gas plants, refineries and offshore platforms. Radio and wireless devices sold in Canada need ISED certification against the Radio Standards Specifications, such as RSS-247 for Wi-Fi and Bluetooth and RSS-Gen for general requirements and labelling. An intrinsically safe smartphone distributor in Canada would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Canada has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Canada: Alberta Industrial Heartland, Montney and Duvernay, Sarnia Chemical Valley | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Canada. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Operators and classified areas drawn from the SAMS Canada market guide.
The Great Canadian Oil Sands plant, now part of Suncor, opened in 1967, and Fort McMurray's growth took off as further oil sands plants followed after the 1970s energy crises.
Zone approval in Canada uses the CAN/CSA C22.2 No. 60079 series, and an existing IECEx certificate with test reports can shorten the work, because mainly the national differences then have to be addressed.
Fort McMurray sits in the middle of the Athabasca oil sands, 435 km north-east of Edmonton on Highway 63, surrounded by boreal forest, so access is largely by one road or by air.
Fort McMurray averages minus 17.2 degrees Celsius in January, with a recorded low of minus 53.3 degrees, so batteries, touchscreens and enclosures need to work in deep cold.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Canada. Pad routes north of Fort McMurray and rounds at Sarnia, Scotford or Kitimat put hours between charging points, and batteries lose capacity in the cold. An intrinsically safe handheld is designed for those routes, with a 4,000 mAh cell and four-constellation GNSS. Heavy gloves and FR coveralls leave one usable hand.
A distributor for Canada would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
The market guide for Canada covers Athabasca oil sands, Cold Lake and the Lakeland, Alberta Industrial Heartland, Montney and Duvernay, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Canada.
Devices with Wi-Fi, Bluetooth or cellular radios generally need ISED certification and must meet the applicable Radio Standards Specifications, along with interference limits such as ICES-003. A certification body recognised by ISED can issue it. Confirm the exact requirements for your device with ISED or an accredited body.
The Canadian Electrical Code now uses Zones in Section 18, while Class and Division rules remain in Annex J for existing installations, so older plants may still be classified by Division. Check the classification drawing for the area and make sure the device marking matches the system used there.
The marking target is II 2 G Ex ib IIC T4, with Class I Division 1 pursued on the same intrinsic safety basis. Nothing has been issued: certification is in progress. Canadian Section 18 classifies by Zone while Annex J18 keeps Division. Check which system your site's drawings use before anything is specified.
More on Canada, and on other places in Canada.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.