India: geography and layout
The largest crude reserves are in the Western Offshore region at 37 per cent and Assam at 27 per cent, so both offshore platforms and remote north-eastern fields matter.
The IS-04Z1 is designed for people who work inside classified areas at Indian refineries, gas plants, LNG jetties and API blocks: field operators, inspection engineers, shift in-charges, and the HSE and materials teams whose sign-off a device has to survive. This page sets out how an intrinsically safe mobile phone supply route to India will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An intrinsically safe mobile phone for India cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | India: Mumbai and the offshore basin, Panipat and Mathura, Jamnagar, Gujarat | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in India. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS India market guide.
The largest crude reserves are in the Western Offshore region at 37 per cent and Assam at 27 per cent, so both offshore platforms and remote north-eastern fields matter.
Imports are applied for by an Indian service provider or distributor, and there is no separate PESO mark; the Ex marking and the approval letter show compliance.
India imports 82 per cent of its oil needs, so import terminals, tank farms and coastal refineries are central to supply.
India's first oil deposits were found near Digboi in Assam in 1889, and its gas industry began in the 1960s with discoveries in Assam and the Mumbai High field.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In India. Field operators, inspection engineers and shift in-charges at Indian refineries and gas plants make rounds that cross zone boundaries many times. An intrinsically safe handheld lets them record readings and photograph issues at the point of work, rather than walking to a safe area. That is the design intent, pending approval.
Nothing can be bought for India today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
The market guide for India covers Jamnagar, Gujarat, Dahej and the Gujarat PCPIR, Hazira and Surat, Vadodara, Koyali, Ankleshwar, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
PESO approval is required for Ex electrical apparatus at petroleum, gas cylinder and pressure vessel premises, and imports are applied for through an Indian service provider or distributor. Whether it applies to a given site depends on the licensing category, so ask the site's safety team and a PESO consultant.
Typically the large coastal refineries such as Jamnagar, offshore platforms in the Western Offshore region, petrochemical and fertiliser complexes, and gas fields in Assam and Gujarat. Each operator issues its own area classification, so request the drawing, gas group and temperature class first.
The market guide lists PESO, BIS and WPC approvals as in progress, alongside IECEx. None has been granted yet. Which are needed for a given site depends on the operator and the regulator, so ask the site operator and check the current status before ordering.
More on India, and on other places in India.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.