Underground operations
Grasberg has three active underground mines (Grasberg Block Cave, Deep Mill Level Zone and Big Gossan) alongside the former open pit.
Timika, capital of Mimika Regency in Central Papua, is the service base for the Grasberg copper and gold mine run by PT Freeport Indonesia. PT Freeport Indonesia runs Grasberg, with Indonesian state interests through MIND ID holding 51.23 percent and Freeport-McMoRan 48.77 percent, and mining rights were extended to 2041. Distribution partners for Timika and the Grasberg mining district are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Timika and the Grasberg mining district has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Timika and the Grasberg mining district: Concentrate port and dewatering, Underground mine areas, Concentrator and process plant | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Timika Mining. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Grasberg has three active underground mines (Grasberg Block Cave, Deep Mill Level Zone and Big Gossan) alongside the former open pit.
Timika averages about 5,690 mm of rain a year in a tropical rainforest climate.
Flotation reagents separate a copper-gold concentrate, which is piped as slurry through three pipelines about 100 km to the port of Amamapare, where it is dewatered, dried and shipped to smelters.
The port facilities include a coal-fired power station that is to be replaced by 2027 with a 265 megawatt liquefied natural gas combined cycle plant, which will add an LNG supply chain to the site.
Grasberg held proven and probable reserves of 14.0 million tonnes of copper, 808 tonnes of gold and 3,773 tonnes of silver at the end of 2022, so mining is expected to continue for decades.
The Grasberg mine lies in Mimika Regency, Central Papua, near Puncak Jaya, and the original mine was built at about 4,100 metres above sea level, with the open pit rim at roughly 4,270 metres.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Timika and the Grasberg mining district. Inspection rounds link the concentrator, fuel storage and the port at Amamapare, with underground mines in three active areas. A handheld designed for intrinsic safety could hold checklists and photos, where permitted. Underground use needs the operator's specific approval.
A distributor for Timika and the Grasberg mining district would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
Likely candidates are concentrator and process plant, fuel storage and distribution, concentrate port and dewatering, underground mine areas. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Timika and the Grasberg mining district.
Altitude, heavy rain, long underground haulage and remote supply make it demanding. Underground mines can have gas or dust, and surface plants have flotation chemicals, so confirm area classification with the operator and plan for battery life and spares.
The operation uses its own port at Amamapare, an airstrip and long access roads built for the mine, and Timika is the regional town. Expect long lead times, customs clearance in Indonesia and site security and induction procedures before devices go underground.
Grasberg sits at about 4,100 metres and the region is very wet, so temperature, condensation and battery behaviour matter. Check the rated operating range and sealing. IP68 is not explosion protection. Confirm site requirements with the operator.
More on Timika Mining, and on other places in Indonesia.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.