Leith
In December 2024 Forth Ports announced a 50 million pound private investment at the Port of Leith after winning its largest offshore wind contract, for the 1.1 GW Inch Cape project. Foundations are handled at Leith.
Edinburgh is Scotland's capital and has few classified areas itself. Its Port of Leith is being developed for offshore wind, while the Grangemouth petrochemical complex lies further up the Forth, where hazardous-area demand is concentrated. If you are specifying an industrial smartphone for Edinburgh, Leith and the Forth, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Edinburgh, Leith and the Forth: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Edinburgh, Leith and the Forth: Port and offshore wind foundation handling, Petrochemical process units at Grangemouth, Fuel import and storage terminal at Grangemouth | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Edinburgh. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
In December 2024 Forth Ports announced a 50 million pound private investment at the Port of Leith after winning its largest offshore wind contract, for the 1.1 GW Inch Cape project. Foundations are handled at Leith.
The INEOS site on the Firth of Forth houses the last operating ethylene cracker in the UK and imports US ethane. Grangemouth is Scotland's largest container port.
Edinburgh has a cool temperate maritime climate, known as the windy city, with prevailing south-westerly winds, rainfall spread evenly through the year, and haar, a sea fog, on easterly winds.
Edinburgh lies on the south shore of the Firth of Forth in Scotland's Central Belt, with 506,520 residents in 2020 and a wider metropolitan area of 912,490.
The city has long been a centre of education in medicine, law, science and engineering, which supports a trained workforce for the professional and technical services based there.
The city is the United Kingdom's second-largest financial and administrative centre after London, and a financial district has grown west of the castle since the 1990s.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Edinburgh, Leith and the Forth. A fleet for Forth-side work would cover contractors moving between the offshore wind effort at Leith and the Grangemouth complex. MDM or EMM enrolment helps a supervisor keep devices consistent across both sites. Because Grangemouth's refinery has changed role, contractor mixes may shift, so enrolment and return procedures should be flexible.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are port and offshore wind foundation handling, petrochemical process units at grangemouth, fuel import and storage terminal at grangemouth, ethane import and storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Edinburgh is known for wind, and easterly haar brings damp sea fog, so devices used on the waterfront need good ingress protection and cleaning. Typically workers also note reduced visibility, so check screens, torches and alarms against site conditions.
Yes. The Dangerous Substances and Explosive Atmospheres Regulations apply across Great Britain, and the Health and Safety Executive enforces them with local authorities. Employers must classify areas and control ignition sources, so ask sites for their hazardous-area records.
Petroineos ended crude processing at the Grangemouth refinery in 2025, and the site is becoming a fuels import, storage and distribution terminal. The adjacent INEOS complex still operates the UK's last ethylene cracker. Contractor needs may therefore differ from a few years ago, so ask the operator for current requirements.
More on Edinburgh, and on other places in United Kingdom.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.