Deep-water terminal
Canaport was commissioned in 1970 and was the first deep-water crude terminal in the western hemisphere able to receive supertankers.
Irving Oil's Saint John refinery is Canada's largest, able to process more than 320,000 barrels of crude per day. An Irving Oil statement from the Canaport LNG agreements described the refinery as predominantly an export refinery that supplies about half of Canada's petroleum product exports. An industrial smartphone distributor in Saint John, New Brunswick would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Saint John, New Brunswick has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Saint John, New Brunswick: Refinery process units, Crude and product storage, Marine terminal | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Saint John Refinery. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Canaport was commissioned in 1970 and was the first deep-water crude terminal in the western hemisphere able to receive supertankers.
The Bay of Fundy coast is damp and foggy, so ingress protection and corrosion resistance are useful.
Irving Oil also operates Ireland's only refinery at Whitegate, County Cork, and its home office in Uptown Saint John opened officially in 2019, so supplier relations run through Saint John.
The Bay of Fundy never fully freezes, which moderates winters, but the January average is still about minus 8 degrees Celsius and rain and snow total roughly 1,295 mm a year, so outdoor equipment faces cold, wet conditions.
The Canaport LNG regasification terminal was permitted for an initial 1 billion cubic feet per day and was set up by Irving Oil and Repsol to serve Atlantic Canada and the US Northeast.
Irving Oil moves much of its product by tanker to regional terminals at ports in Atlantic Canada, Quebec and New England, an area it treats as under-served by pipelines.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Saint John, New Brunswick. More than 80 per cent of production is reported as exported to the United States, so ship movements, contractors and terminal staff all feature. A managed fleet with EMM or MDM enrolment would help control devices across them. The IS-04Z1 is designed for Android 16 management, with charging in safe areas.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Saint John, New Brunswick yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are refinery process units, crude and product storage, marine terminal. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Saint John, New Brunswick.
Process units, tank farms, loading and marine terminal areas commonly have Zone 1 or 2 gas areas. The refinery's classification drawings define gas group and temperature class, so request them before specifying handheld devices.
Canaport is a crude oil receiving terminal with a single-point mooring and an LNG terminal near Saint John. Marine and tank areas bring flammable vapour risks, so confirm the terminal's classification and device rules with the operator.
Irving Oil, as operator, decides which equipment is permitted in each area, normally through its HSE or electrical authority. Ship and tanker crews may have their own requirements too. Ask the refinery for its zone data and approval process, and do not assume a manufacturer certificate alone will be enough.
Related guides for Saint John Refinery and for Canada.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.