Permits
Access to oilfield sites is normally by operator-issued permit, so plan visits and deliveries ahead.
Kirkuk is the centre of northern Iraq's oil industry; the Baba Gurgur discovery in 1927 launched exports from the Kirkuk field. BP signed a preliminary deal to develop the Kirkuk, Bai Hassan, Jambur and Khabbaz fields, which it estimates hold about nine billion barrels of recoverable oil, under a profit-sharing model. Distribution partners for Kirkuk are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Kirkuk has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Kirkuk: Wellheads and gathering stations, Gas processing, Crude pumping and pipeline facilities | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kirkuk. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Access to oilfield sites is normally by operator-issued permit, so plan visits and deliveries ahead.
Summers are extremely hot and dry, with record highs above 50 C, and winters are mild with moderate rain.
Kirkuk field was discovered at Baba Gurgur in 1927 and brought into production in 1934 when export pipelines were completed, and it has remained the most important part of northern Iraq's output.
The field had over 10 billion barrels of proven remaining reserves in 1998, so it is a mature, large-scale operation with legacy infrastructure.
The Kirkuk-Ceyhan crude pipeline runs about 970 km to the Turkish coast with two lines of 46 and 40 inches and a combined design capacity of 1.5 million barrels a day, making it Iraq's largest export line.
Iraq's winters are cooler and wetter, with average temperatures around 10 degrees Celsius, and the north sometimes falls below freezing.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Kirkuk. A mature-field programme runs many contractors and rotating crews, so enrolment and removal of devices is a daily task. EMM and MDM support on the IS-04Z1 gives an administrator one place to apply policies and apps. Charging should be done in a safe area, and permits for site entry should be considered when planning shared devices.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Kirkuk yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are wellheads and gathering stations, gas processing, crude pumping and pipeline facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Kirkuk.
BP signed a preliminary agreement for four Kirkuk-region fields, with a profit-sharing model reported. The detailed timing and scope depend on final contracts, so check status with the operator.
Oil wells, gathering stations, separators, storage tanks, and gas processing and flare systems across the Kirkuk, Bai Hassan, Jambur and Khabbaz fields. Zones are set by the operator for each facility.
The equipment depends on the area classification, not the age of the field. Rehabilitation and well work may open or alter classified areas, so the operator's current zone drawings apply. Ask the operator for them before selecting a device, whatever the field's history.
More on Kirkuk, and on other places in Iraq.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.