Extreme heat and humidity
Summer temperatures regularly exceed 50 C with humidity that can pass 90 per cent, which affects device thermal limits and battery life.
Basra is Iraq's southern oil hub and the base of the Basra Oil Company. Reconstruction projects funded by foreign investment include the Grand Faw Port, which has drawn global attention to the region's role as a transport hub. An ATEX and IECEx mobile phone distributor in Basra would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Basra has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Basra: Gas processing plants, Crude storage and export terminals, Degassing and gathering stations | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Basra. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Summer temperatures regularly exceed 50 C with humidity that can pass 90 per cent, which affects device thermal limits and battery life.
Major fields are run by the state operator or joint operating organisations, and site entry is normally controlled through operator-issued permits.
Majnoon is held by Basra Oil Company (45 percent), Petronas (30 percent) and Missan Oil Company (25 percent) and produces around 245,000 barrels a day.
Basra is Iraq's third-largest city and a port on the Shatt al-Arab, which empties into the Persian Gulf, and it is the country's only coastal region together with its governorate.
Rumaila, operated through the Rumaila Operating Organisation under a contract running to 2034, produced about 1.42 million barrels a day in 2022, roughly 30 percent of Iraq's total.
A Basrah to Haditha oil pipeline project worth about 4.56 billion dollars was approved by the Iraqi Cabinet in December 2024.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Basra. Basra's large field operators and joint operating organisations bring in international contractors, and their reviewers usually look for both ATEX and IECEx documents when approving a handheld for degassing stations and gas plants. A dual route lets one device file serve different EPC and operator checklists. The IS-04Z1 has no certificate yet, as certification is in progress.
A distributor for Basra would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are degassing and gathering stations, wellheads and flowlines, gas processing plants, crude storage and export terminals. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Basra.
Basra Oil Company is the state operator, and fields such as Rumaila and Majnoon are run through operating organisations or ventures with partners such as BP, CNPC and Petronas. Site access rules come from each operator.
It is the base for Basra Oil Company and the very large fields of the south, plus storage and export terminals. These create wellsite, gathering, tank and jetty hazardous areas across a wide region.
Entry is normally controlled through operator-issued permits, and each operator runs its own technical review and approved-vendor process. The operator also classifies the area. A supplier cannot self-approve a device, so submit the datasheet and certification status early to the relevant operator or contractor.
Other guides for Basra, other places in Iraq, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Name the site and the operator and we will send what is available before launch.