Permits
Access to oilfield sites is normally by operator-issued permit, so plan visits and deliveries ahead.
Kirkuk is the centre of northern Iraq's oil industry; the Baba Gurgur discovery in 1927 launched exports from the Kirkuk field. Summers from May to October are very hot and dry with temperatures above 46 degrees Celsius, and dry dusty winds are common. Distribution partners for Kirkuk are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Kirkuk has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Level of protection | ia, ib or ic matched to the zone | ib, for Zone 1 |
| Entity parameters | Uo, Io and Po within the device limits | Published with the certificate |
| Accessories | Chargers and cases certified with the device | Defined at certification |
| Where it applies | Kirkuk: Wellheads and gathering stations, Gas processing, Crude pumping and pipeline facilities | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Kirkuk. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Access to oilfield sites is normally by operator-issued permit, so plan visits and deliveries ahead.
Summers are extremely hot and dry, with record highs above 50 C, and winters are mild with moderate rain.
Kirkuk has a diverse population of Kurds, Iraqi Turkmen and Arabs, so crews and local contractors may work in Arabic, Kurdish or Turkmen, and clear multilingual instructions help.
BP signed a preliminary deal to develop the Kirkuk, Bai Hassan, Jambur and Khabbaz fields, which it estimates hold about nine billion barrels of recoverable oil, under a profit-sharing model.
Telecom equipment sold in Iraq needs Communications and Media Commission type approval, with certificates valid for one year and a local partner involved.
Kirkuk field was discovered at Baba Gurgur in 1927 and brought into production in 1934 when export pipelines were completed, and it has remained the most important part of northern Iraq's output.
Intrinsic safety limits the electrical and thermal energy in a circuit so that neither a spark nor a hot surface can ignite a gas or dust atmosphere, even when a fault occurs. The ib level, used for Zone 1, tolerates one fault. It is the usual way to make a handheld device that a worker carries continuously through a hazardous area.
The IS-04Z1 is designed on this principle for Zone 1 and Zone 21 (marking target II 2 G Ex ib IIC T4). Intrinsic safety is a design basis, not a certificate: certification is in progress and none has been issued yet.
In Kirkuk. Mature fields mean frequent well work, maintenance and inspection visits across wellheads, stations and pumping facilities. A handheld that is intrinsically safe lets a crew photograph equipment, fill in permits and report while moving through classified areas. That is the working pattern the IS-04Z1 is designed for, once certified and accepted by the operator.
A distributor for Kirkuk would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
The circuits are designed to limit energy so a spark or hot surface cannot ignite a gas or dust atmosphere, even with one fault (level ib, Zone 1). Certification of that design is in progress.
Likely candidates are wellheads and gathering stations, gas processing, crude pumping and pipeline facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Kirkuk.
BP signed a preliminary agreement for four Kirkuk-region fields, with a profit-sharing model reported. The detailed timing and scope depend on final contracts, so check status with the operator.
Oil wells, gathering stations, separators, storage tanks, and gas processing and flare systems across the Kirkuk, Bai Hassan, Jambur and Khabbaz fields. Zones are set by the operator for each facility.
The equipment depends on the area classification, not the age of the field. Rehabilitation and well work may open or alter classified areas, so the operator's current zone drawings apply. Ask the operator for them before selecting a device, whatever the field's history.
Related guides for Kirkuk and for Iraq.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.