Large refinery site
The Mina Al-Ahmadi refinery covers about 10.5 square km along the shore and has been upgraded across 39 units.
Al Ahmadi is a town in southern Kuwait founded in 1946 after the discovery of oil, and it is the headquarters of Kuwait Oil Company and Kuwait National Petroleum Company. Mina Al-Ahmadi refinery was first built in 1949, sits about 40 km south of Kuwait City and covers about 10.5 square kilometres. An industrial smartphone distributor in Al Ahmadi would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Al Ahmadi has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Al Ahmadi: Crude and product storage, Marine loading facilities, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Al Ahmadi. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
The Mina Al-Ahmadi refinery covers about 10.5 square km along the shore and has been upgraded across 39 units.
Summers are very hot and the site is coastal, so heat, dust and humidity all affect outdoor equipment.
KNPC's April 2025 merger with KIPIC, announced by Kuwait Petroleum Corporation, reshapes the refining company structure, so supplier registration may be under the merged entity.
Burgan's subsurface reservoirs were discovered in February 1938, and Kuwait Oil Company began commercial oil production there in 1946.
Summer daily highs average 42 to 46 degrees Celsius, so outdoor refinery and wellsite work faces strong heat for much of the year.
CITRA type approval for telecom equipment lasts three years and needs no local representative, while the Public Authority for Industry handles product safety registration.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Al Ahmadi. Al Ahmadi is a company town where operator staff, contractors and service firms are concentrated in a small area, so a shared fleet can be supported centrally. EMM and MDM support on the IS-04Z1 lets an administrator manage many devices. Charging should be in safe areas, and each operator's supplier portal rules should be checked first.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Al Ahmadi yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are refinery process units, oil gathering and processing, crude and product storage, marine loading facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Al Ahmadi.
Kuwait Oil Company for field work and KNPC, now merging with KIPIC, for refinery work. Both run their own procurement and HSE approval processes, so ask each for the current procedure.
Summer highs average 42 to 46 degrees Celsius with a national record of 54, so use devices rated for high ambient temperatures and avoid leaving them in vehicles.
KOC and KNPC each run their own supplier registration and prequalification, KOC through its E-Business portal and KNPC through its eSourcing portal. A device supplier normally needs to be registered before it is considered. Confirm current requirements with the operator.
Other guides for Al Ahmadi, other places in Kuwait, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.