Large refinery site
The Mina Al-Ahmadi refinery covers about 10.5 square km along the shore and has been upgraded across 39 units.
Al Ahmadi is a town in southern Kuwait founded in 1946 after the discovery of oil, and it is the headquarters of Kuwait Oil Company and Kuwait National Petroleum Company. Burgan's subsurface reservoirs were discovered in February 1938, and Kuwait Oil Company began commercial oil production there in 1946. An ATEX and IECEx mobile phone distributor in Al Ahmadi would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Al Ahmadi has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Al Ahmadi: Crude and product storage, Marine loading facilities, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Al Ahmadi. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
The Mina Al-Ahmadi refinery covers about 10.5 square km along the shore and has been upgraded across 39 units.
Summers are very hot and the site is coastal, so heat, dust and humidity all affect outdoor equipment.
Summer daily highs average 42 to 46 degrees Celsius, so outdoor refinery and wellsite work faces strong heat for much of the year.
CITRA type approval for telecom equipment lasts three years and needs no local representative, while the Public Authority for Industry handles product safety registration.
Mina Al-Ahmadi refinery was first built in 1949, sits about 40 km south of Kuwait City and covers about 10.5 square kilometres.
Mina Abdullah refinery, built in 1958, is about 46 km south of Kuwait City and is rated at 280,000 barrels a day.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Al Ahmadi. Kuwait Oil Company and Kuwait National Petroleum Company each run their own supplier registration and prequalification, and their HSE reviewers evaluate certificate evidence in that context. A dual ATEX and IECEx route helps international contractors and EPCs who move between operators. The IS-04Z1 has no certificate at present, as certification is in progress.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Al Ahmadi. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are refinery process units, oil gathering and processing, crude and product storage, marine loading facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Al Ahmadi.
Kuwait Oil Company for field work and KNPC, now merging with KIPIC, for refinery work. Both run their own procurement and HSE approval processes, so ask each for the current procedure.
Summer highs average 42 to 46 degrees Celsius with a national record of 54, so use devices rated for high ambient temperatures and avoid leaving them in vehicles.
KOC and KNPC each run their own supplier registration and prequalification, KOC through its E-Business portal and KNPC through its eSourcing portal. A device supplier normally needs to be registered before it is considered. Confirm current requirements with the operator.
Related guides for Al Ahmadi and for Kuwait.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.