Thames Oilport
The former Coryton refinery, which stopped refining in 2012 after Petroplus collapsed, became a fuel import terminal. Greenergy holds two thirds and Shell one third after Greenergy bought Vopak's share.
London has no refinery, but Thames-side fuel terminals supply the capital: Thames Oilport on the former Coryton refinery site and the large West Thurrock terminal in Essex. Gas network and utility sites add smaller classified areas. If you are specifying an industrial mobile phone for London and the Thames, this page covers the markings, the approvals and the current certification status of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for London and the Thames: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | London and the Thames: Fuel storage terminals, Marine jetties, Road tanker loading | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in London. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The former Coryton refinery, which stopped refining in 2012 after Petroplus collapsed, became a fuel import terminal. Greenergy holds two thirds and Shell one third after Greenergy bought Vopak's share.
The terminal at West Thurrock, Essex, with about 86 tanks for petroleum products, chemicals and liquefied gas, was acquired in 2016 by Navigator Terminals, a Greenergy and Macquarie joint venture.
London is Europe's largest city economy and one of the world's major financial centres, so many suppliers, consultancies and head offices that approve equipment are based there.
London stands on the River Thames at the head of a 50 mile tidal estuary down to the North Sea, with 9.14 million residents in 2025 and a metropolitan area of 15.4 million.
The Port of London expanded downstream in the 18th and 19th centuries, and the Underground, the world's first urban rail network, was created to ease traffic congestion.
London's diverse communities speak over 300 languages, so site teams are multilingual, though safety documentation is usually in English.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In London and the Thames. Terminal fleets involve operator staff, hauliers and visiting contractors, so MDM or EMM enrolment and clear role-based apps are important. Because the terminals are in Essex, crews travel out from the capital, and devices must be signed in and out reliably. Charging should take place in offices or control rooms, away from tank areas.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are fuel storage terminals, marine jetties, road tanker loading, gas network sites. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
A temperate oceanic climate means mild temperatures but frequent light rain, on about 110 days a year. Typically devices used outdoors need good water ingress protection and users check ratings against site conditions, especially on the tidal Thames.
Deliveries typically arrive by road or air, and the congested metropolitan area calls for scheduled slots and extra time. Confirm customs treatment for imported electronics and any site access or gate checks with the client.
The terminals are in Essex, so crews and equipment normally travel by road from the capital, and site access follows each operator's induction and permit rules. Plan time for sign-in, safe-area handover and device checks. Confirm the current access arrangements with the terminal operator.
Other guides for London, other places in United Kingdom, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.