Umm Al Nar closed
ADNOC's older Abu Dhabi Refinery on Umm Al Nar Island, which processed up to 85,000 barrels a day, was shut in 2022 as ADNOC focused its downstream strategy on Ruwais.
ADNOC's Ruwais complex in Abu Dhabi's Al Dhannah area is the biggest refinery in the Middle East, with Ruwais Refinery East rated at over 922,000 barrels a day and Ruwais Refinery West at up to 417,000. One published refinery list gives the Jebel Ali refinery a capacity of 140,000 barrels a day, showing that it is a mid-sized plant compared with the Ruwais complex. An industrial mobile phone distributor in UAE refineries would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. UAE refineries has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | UAE refineries: Loading jetties and gantries, Product pipelines, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in UAE Refineries. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
ADNOC's older Abu Dhabi Refinery on Umm Al Nar Island, which processed up to 85,000 barrels a day, was shut in 2022 as ADNOC focused its downstream strategy on Ruwais.
Hot, humid Gulf coastal climate; outdoor equipment should resist heat and salt air.
ENOC opened its first oil refinery in 1999 at 120,000 barrels a day for about 1.5 billion dirhams, so Dubai's refining is much younger than Abu Dhabi's.
ADNOC's Ruwais Refinery East can process up to 922,000 barrels a day of crude and condensate, the largest refinery in the Middle East, and is closely integrated with other plants in the Ruwais industrial area.
The same list shows smaller Fujairah plants of 80,000, 7,500 and 70,000 barrels a day, so refining sites are scattered across the east coast as well as the Gulf.
Outside Abu Dhabi, the Jebel Ali refinery in Dubai is run by ENOC Processing Company, a subsidiary of ENOC, the Dubai government's energy group established in 1993.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In UAE refineries. ADNOC refining operations run their own supplier registration and equipment approval, and contractors on turnarounds work to the operator's rules. A phone would be enrolled in the employer's EMM or MDM. The IS-04Z1 is designed for that, with charging in safe areas such as control rooms.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for UAE refineries yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are refinery process units, tank farms, loading jetties and gantries, product pipelines. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for UAE refineries.
A splitter typically produces mostly naphtha and jet fuel, which are light, volatile and easily ignited, so flammable vapour is the main concern. That usually means gas classification around pumps, tanks and loading areas; the operator sets the zones and gas group.
One published list gives Jebel Ali about 140,000 barrels a day, against several hundred thousand for the Ruwais complex. Smaller plants can mean fewer units on site, but hazards per unit are similar, and each has its own rules for contractors.
The Gulf coast is hot and humid, and outdoor equipment should resist heat and salt air. The IS-04Z1 is designed to IP68 with a 4,000 mAh battery, but heat and salt limits are not published. Ask for the datasheet and agree outdoor-use conditions with the operator.
Other guides for UAE Refineries, other places in United Arab Emirates, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.