Island access
Access is restricted to personnel with security passes, and staff travel by ferry, so equipment is usually checked before the crossing.
Pulau Bukom is a restricted-access island about 5 km south of mainland Singapore, home to a 237,000 barrel-per-day refinery and an ethylene cracker. Aster Bukom concentrates on refining and ethylene production, while Aster's Jurong Island complex makes chemicals, so the two sites act as one integrated operation. An industrial mobile phone distributor in Pulau Bukom would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Pulau Bukom has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ingress protection | IP rating for dust and water | IP68 design |
| Fleet management | EMM and MDM support | Android 16 with EMM and MDM |
| Explosion protection | A separate certificate and marking | In progress; not issued |
| Where it applies | Pulau Bukom: Crude and product tank farms, Jetties, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Pulau Bukom Refinery. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Access is restricted to personnel with security passes, and staff travel by ferry, so equipment is usually checked before the crossing.
Bukom is linked by subsea pipeline to chemical units on Jurong Island, so contractors may work across both locations.
Singapore's energy and chemicals sector is its second-largest manufacturing sector, so the island's refinery and cracker sit within a national cluster of more than 100 chemicals companies.
The Bukom and Jurong Island sites are joined by a 5 km subsea pipeline, which carries product between islands and reduces ship-to-shore transfers.
Pulau Bukom has been the site of Singapore's first oil refinery since 1961, and the island has hosted refining, trading and related services for more than six decades.
The Shell stake in the park was acquired in April 2025 by CAPGC, a joint venture between a Chandra Asri subsidiary and a Glencore subsidiary, and the site was renamed Aster Energy and Chemicals Park.
“Industrial” describes a phone built for plant conditions: sealed, drop-resistant and manageable at fleet scale through Android Enterprise. It does not by itself mean the phone may enter a classified area. Only a device with a valid explosion-protection certificate and marking may do that.
The IS-04Z1 is designed to be both an industrial Android phone (IP68, 4,000 mAh battery, 50 MP camera, Android 16 with EMM and MDM support) and an intrinsically safe one. Its explosion-protection certificates are in progress and have not been issued.
In Pulau Bukom. Contractors may move between Bukom and the linked chemical units on Jurong Island, so a managed fleet needs consistent EMM or MDM enrolment on both sides. Devices are usually checked before the ferry crossing, which makes pre-enrolment sensible. Charging should happen in a safe area, never inside a classified zone, and the operator sets the network rules.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Pulau Bukom yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Yes by design: IP68 sealing, a 4,000 mAh battery, a 50 MP camera and Android 16 with EMM and MDM support. The explosion-protection certificates are separate and still in progress.
Likely candidates are refinery process units, ethylene cracker, crude and product tank farms, jetties. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Pulau Bukom.
The complex is operated as Aster Bukom, part of Aster Chemicals and Energy, which was acquired in April 2025 through CAPGC, a joint venture between a Chandra Asri subsidiary and a Glencore subsidiary. Use the Aster name when asking about supplier registration.
Bukom is an island, so access is typically arranged through the operator, with pass checks before travel. Equipment usually has to be declared and approved in advance, so plan lead time for inspection and any device certification review.
The operator, now the Aster site owner, sets contractor and equipment approvals and classifies its own areas. SAMS cannot approve a device for a site. Share the IS-04Z1 datasheet and marking target with its procurement and HSE teams, and note that certification is still in progress.
Related guides for Pulau Bukom Refinery and for Singapore.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.