Nigeria: industry on the ground
Nigeria LNG's plant on Bonny Island began production in 1999 and now has six liquefaction trains with a combined capacity of 22 million tonnes a year of LNG, alongside natural gas liquids for export.
A Zone 1 / Zone 21 smartphone for crews on Niger Delta flow stations, deepwater FPSOs, export terminals and the refining complexes at Lekki and Eleme. Buyers searching for an IECEx smartphone supplier for Nigeria can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. An IECEx smartphone for Nigeria cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Nigeria: Eleme, Rivers State, Lagos and Apapa, Port Harcourt, Rivers State | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Nigeria. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The classified areas, operators and sites below are the ones covered in the SAMS Nigeria market guide.
Nigeria LNG's plant on Bonny Island began production in 1999 and now has six liquefaction trains with a combined capacity of 22 million tonnes a year of LNG, alongside natural gas liquids for export.
The Dangote Refinery at Lekki, Lagos was commissioned in May 2023, began operations in January 2024 and has a stated capacity of 700,000 barrels a day.
The Delta states of Bayelsa, Delta and Rivers form the historic core of the region, which is petroleum-rich and has been the centre of international attention for its oil industry.
The Niger Delta extends over about 70,000 square kilometres, around 7.5 per cent of Nigeria's land area, between the Bight of Benin and the Bight of Bonny.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Nigeria. Nigeria hosts international operators such as Shell, TotalEnergies and Chevron, plus Nigerian companies, EPCs and contractors that move between Delta, offshore and Lekki work. IECEx gives them a shared scheme. Ask for the certificate of conformity and the schedule of conditions. SONCAP and NCC steps run separately for the product and its radio.
Nothing can be bought for Nigeria today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Nigeria covers Port Harcourt, Rivers State, Warri and Escravos, Bonny Island, Lekki Free Zone, Lagos, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
The Delta is typically a low-lying, hot and humid region with heavy seasonal rain, so corrosion and moisture are common concerns. Check ingress protection, corrosion resistance and the operating temperature range, and ask the operator about site transport, such as boat or helicopter, and device rules.
A large new refinery is operated by its owner, which applies its own site HSE, permit and equipment requirements alongside Nigerian law. Contractors should ask the operator for its induction, permit-to-work and approved-equipment procedures rather than assuming the practices of other Nigerian sites.
The programme lists IECEx for hazardous area use and SONCAP and NCC steps for national conformity and the radio, all in progress. Nothing is yet issued. Ask your supplier and the site operator which documents your procurement and HSE teams will require before purchase.
Related guides for Nigeria and for Nigeria.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.