Nigeria: industry on the ground
Nigeria LNG's plant on Bonny Island began production in 1999 and now has six liquefaction trains with a combined capacity of 22 million tonnes a year of LNG, alongside natural gas liquids for export.
A Zone 1 / Zone 21 smartphone for crews on Niger Delta flow stations, deepwater FPSOs, export terminals and the refining complexes at Lekki and Eleme. This page sets out how a hazardous area mobile phone supply route to Nigeria will work for the IS-04Z1, and what is and is not available before launch.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. A hazardous area mobile phone for Nigeria cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Nigeria: Eleme, Rivers State, Lagos and Apapa, Port Harcourt, Rivers State | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Nigeria. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Operators and classified areas drawn from the SAMS Nigeria market guide.
Nigeria LNG's plant on Bonny Island began production in 1999 and now has six liquefaction trains with a combined capacity of 22 million tonnes a year of LNG, alongside natural gas liquids for export.
The Dangote Refinery at Lekki, Lagos was commissioned in May 2023, began operations in January 2024 and has a stated capacity of 700,000 barrels a day.
The Delta states of Bayelsa, Delta and Rivers form the historic core of the region, which is petroleum-rich and has been the centre of international attention for its oil industry.
The Niger Delta extends over about 70,000 square kilometres, around 7.5 per cent of Nigeria's land area, between the Bight of Benin and the Bight of Bonny.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Nigeria. Classified areas here split three ways: onshore Delta production around Port Harcourt and Warri, deepwater FPSOs offshore, and downstream plants at Lekki and Eleme with product terminals at Lagos and Apapa. The Onne free zone supports supply. Operators classify their own areas, so SAMS provides no drawings.
Nothing can be bought for Nigeria today: the IS-04Z1 is pre-launch, and SAMS will supply end users through authorised distributors once certificates exist. What a buyer can do now is take the specification, ask for the written certification schedule and arrange a safe-area evaluation, so that the right local channel contacts you at launch.
The technical specification, marking target and conditions of use, sent by email.
Which certificates are in progress, in what order, and what is still to be confirmed.
Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.
Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
The market guide for Nigeria covers Port Harcourt, Rivers State, Warri and Escravos, Bonny Island, Lekki Free Zone, Lagos, among others. Site-level pages are linked below.
Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.
The Delta is typically a low-lying, hot and humid region with heavy seasonal rain, so corrosion and moisture are common concerns. Check ingress protection, corrosion resistance and the operating temperature range, and ask the operator about site transport, such as boat or helicopter, and device rules.
A large new refinery is operated by its owner, which applies its own site HSE, permit and equipment requirements alongside Nigerian law. Contractors should ask the operator for its induction, permit-to-work and approved-equipment procedures rather than assuming the practices of other Nigerian sites.
The programme lists IECEx for hazardous area use and SONCAP and NCC steps for national conformity and the radio, all in progress. Nothing is yet issued. Ask your supplier and the site operator which documents your procurement and HSE teams will require before purchase.
Other guides for Nigeria, other places in Nigeria, and the pages behind them.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.