Nigeria: industry on the ground
Nigeria LNG's plant on Bonny Island began production in 1999 and now has six liquefaction trains with a combined capacity of 22 million tonnes a year of LNG, alongside natural gas liquids for export.
A Zone 1 / Zone 21 smartphone for crews on Niger Delta flow stations, deepwater FPSOs, export terminals and the refining complexes at Lekki and Eleme. The Nigerian Communications Commission enforces type approval under the Nigerian Communications Act 2003, and mobile phones and wireless adapters must conform to applicable standards before being brought into Nigeria. Distribution partners for Nigeria are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Nigeria has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Ex marking | Group, category, protection concept, gas group, temperature class | II 2 G Ex ib IIC T4 (target) |
| Gas group | IIA, IIB or IIC matched to the area drawing | IIC (target) |
| Temperature class | T-class below the ignition temperature of the gas | T4, 135 °C (target) |
| Where it applies | Nigeria: Bonny Island, Lekki Free Zone, Lagos, Eleme, Rivers State | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Nigeria. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Nigeria market guide covers.
Nigeria LNG's plant on Bonny Island began production in 1999 and now has six liquefaction trains with a combined capacity of 22 million tonnes a year of LNG, alongside natural gas liquids for export.
The Dangote Refinery at Lekki, Lagos was commissioned in May 2023, began operations in January 2024 and has a stated capacity of 700,000 barrels a day.
The Delta states of Bayelsa, Delta and Rivers form the historic core of the region, which is petroleum-rich and has been the centre of international attention for its oil industry.
The Niger Delta extends over about 70,000 square kilometres, around 7.5 per cent of Nigeria's land area, between the Bight of Benin and the Bight of Bonny.
“Ex-proof” is shorthand for equipment carrying an explosion-protection marking (the Ex mark) that matches the area it enters. The marking states the protection concept, gas or dust group and temperature class, and it must be backed by a certificate issued by a recognised body, so a phone described as Ex-proof should come with a certificate number you can check.
The IS-04Z1 is designed to carry the marking II 2 G Ex ib IIC T4. That is a target: certification is in progress, no certificate has been issued, and SAMS will publish the certificate numbers when they exist.
In Nigeria. A marking check in Nigeria compares II 2 G Ex ib IIC T4 with the area drawing. Nigerian hydrocarbon service is typically Group IIA and IIB, so an IIC marking target covers those. Offshore and onshore facilities may also include dust or other hazards that the operator classifies, and the T4 ambient range should be confirmed.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Nigeria. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
The marking target is II 2 G Ex ib IIC T4. It becomes a marking only when the certificate is issued; until then it is a design target.
The market guide for Nigeria covers Port Harcourt, Rivers State, Warri and Escravos, Bonny Island, Lekki Free Zone, Lagos, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Nigeria.
The Delta is typically a low-lying, hot and humid region with heavy seasonal rain, so corrosion and moisture are common concerns. Check ingress protection, corrosion resistance and the operating temperature range, and ask the operator about site transport, such as boat or helicopter, and device rules.
A large new refinery is operated by its owner, which applies its own site HSE, permit and equipment requirements alongside Nigerian law. Contractors should ask the operator for its induction, permit-to-work and approved-equipment procedures rather than assuming the practices of other Nigerian sites.
The programme lists IECEx for hazardous area use and SONCAP and NCC steps for national conformity and the radio, all in progress. Nothing is yet issued. Ask your supplier and the site operator which documents your procurement and HSE teams will require before purchase.
Related guides for Nigeria and for Nigeria.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.