The wider urban area including Sharjah has around 5 million people and the Dubai, Sharjah and Ajman metropolitan area about 6 million, so labour and suppliers can be sourced across emirates. Petrochemical and fuel-handling businesses in the free zone keep classified areas in use. This page explains what to look for in an IECEx smartphone for Dubai industrial areas, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Dubai industrial areas: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Dubai industrial areas: Petrochemical and fuel storage and handling, Power and desalination plant fuel systems, Smelter and metal-processing plant | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Dubai Industrial. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Hot, humid Gulf coast climate; outdoor equipment should cope with heat and salt air.
Jafza, the flagship free zone of DP World, describes itself as home to over 11,000 businesses, including 532+ petrochemical-sector companies, so site rules vary company by company.
Port Rashid opened in 1972, Jebel Ali port in 1979 and the Jebel Ali Free Zone in 1985, so most of Dubai's heavy industry dates from the last five decades.
Dubai Industrial City, founded in 2004, covers about 52 square km, making it a separate large industrial estate from the Jebel Ali port area.
Dubai had about 4 million residents in 2025, 92 per cent of them expatriates, so industrial crews and contractors are highly international.
Dubai handsets fall under the federal Telecommunications and Digital Government Regulatory Authority, which accepts European documents and renews certificates every three years.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Dubai industrial areas. JAFZA hosts a large number of companies, many of them international, so an international reference is practical. An IECEx certificate of conformity with its schedule of conditions would be what a tenant or contractor asks for. SAMS has no IECEx certificate for the IS-04Z1 yet; certification is in progress.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are petrochemical and fuel storage and handling, power and desalination plant fuel systems, smelter and metal-processing plant, industrial chemical warehousing. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Food and beverage plants can have ammonia refrigeration and combustible dusts such as flour or sugar, while base-metal plants can have fuel gas, solvents and metal dust. Whether an area is classified is a site decision, so request the area classification documents.
No. About 92 per cent of Dubai residents are expatriates, so crews speak many languages and English is the common business language. Device screens, alarms and instructions work best with clear icons plus English, and any crew languages the employer specifies.
Summer highs average around 40 degrees C with high humidity, so heat tolerance matters for outdoor work. The IS-04Z1 is designed to IP68 with a 4,000 mAh battery, but no hot-weather limits are published here. Ask for the datasheet and keep devices out of direct sun where possible.
More on Dubai Industrial, and on other places in United Arab Emirates.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.