Governance
The city has been under the Royal Commission for Jubail and Yanbu since 2015.
Jazan City for Primary and Downstream Industries is a planned industrial city in south-west Saudi Arabia, governed by the Royal Commission for Jubail and Yanbu. It hosts Aramco's Jazan refinery, listed at 400,000 barrels a day, alongside a gasification and power complex, which creates Zone 1 areas. An IECEx smartphone distributor in Jazan City for Primary and Downstream Industries would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Jazan City for Primary and Downstream Industries has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Jazan City for Primary and Downstream Industries: Hydrogen production, Power generation, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Jizan. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
The city has been under the Royal Commission for Jubail and Yanbu since 2015.
The IGCC joint venture of Saudi Aramco, Air Products and ACWA Power supplies power, steam and hydrogen to the refinery under a 25-year own-operate-transfer contract.
In 2024 the city became the first Royal Commission industrial city to achieve LEED Platinum certification for its proposed plan and design.
Jizan city has a population of around 320,000 and the wider metropolitan area over 1.5 million, so the area draws on a sizeable local workforce.
The Aramco refinery here processes heavy and medium crude into products including LPG, sulphur, asphalt, benzene and para-xylene, so both gas hazards and sulphur handling arise.
Jizan Regional Airport, also called King Abdullah bin Abdulaziz Airport, lies roughly 60 km south of the city, so allow road time for visiting engineers.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Jazan City for Primary and Downstream Industries. The Jazan complex combines Aramco's refinery with a gasification joint venture that includes international partners, so IECEx is a likely common reference. The certificate of conformity and schedule of conditions would be reviewed. For the IS-04Z1 these are targets only, not issued documents.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Jazan City for Primary and Downstream Industries yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are refinery process units, gasification and syngas, hydrogen production, power generation. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Jazan City for Primary and Downstream Industries.
It is on the humid Red Sea coast in the south-west, far from the Eastern Province hubs, so freight and service visits take longer. The industrial city is newer, with refinery, gasification and power plants, so check each plant operator's own approval rules.
Possibly. The downtown area of the development is planned beside mangroves and near the Farasan Islands, and the city has pursued LEED Platinum certification for its plan. Contractors should expect environmental conditions in permits; confirm with the Royal Commission and the plant operator.
It can. Hydrogen production and syngas areas at Jazan may need a more demanding gas group than ordinary fuel areas. The operator sets the classification, so ask for the gas group on the area drawing. The IS-04Z1 target marking is IIC, but certification is still in progress and no certificate exists yet.
Other guides for Jizan, other places in Saudi Arabia, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.