Export outlet
Three major oil pipelines from the east end at Yanbu, which has two ports: Yanbu Commercial Port and King Fahd Industrial Port.
Yanbu Industrial City on the Red Sea coast was established by royal decree in 1975 and is managed by the Royal Commission for Jubail and Yanbu. Yanbu has three separate parts about fifteen minutes apart by car: Yanbu Al-Bahr in the north, Yanbu Al-Nakhal inland, and the industrial city in the south with the Royal Commission residential area beside it. Distribution partners for Yanbu Industrial City are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Yanbu Industrial City has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Marking | II 2 G Ex ib IIC T4 on the rating plate | Design target; not yet marked |
| EU-type examination certificate | Notified body number and certificate ID | In progress with TÜV; not issued |
| IECEx certificate of conformity | Number listed on the IECEx online register | In progress; not issued |
| Where it applies | Yanbu Industrial City: Crude and product storage and loading, Marine terminals, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Yanbu. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
Three major oil pipelines from the east end at Yanbu, which has two ports: Yanbu Commercial Port and King Fahd Industrial Port.
Hot desert climate with a July record of 51 C; coastal conditions favour sealed equipment.
Yanbu is reached from the east by the East-West crude pipeline of about 1,200 km, which can bring up to 7 million barrels a day from the Eastern Province.
King Fahd Industrial Port is about 25 km long and covers 50 square km, with 34 berths and a stated capacity of 210 million tonnes a year.
Yanbu is the second most populated city in Medina Province after Medina and the second largest Saudi city on the Red Sea after Jeddah, so a local service base exists.
Saudi Arabia's Communications, Space and Technology Commission handles radio type approval; certificates are renewed every two years and European test documents are accepted.
ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.
For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.
In Yanbu Industrial City. Yanbu's refineries include joint ventures such as SAMREF and YASREF with international partners, so reviewers often expect both ATEX and IECEx evidence. A dual route helps contractors who work across partner plants. The IS-04Z1 has no certificate yet; certification is in progress.
A distributor for Yanbu Industrial City would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.
Likely candidates are refinery process units, petrochemical plants, crude and product storage and loading, marine terminals. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Yanbu Industrial City.
Coastal air is humid and salt-laden, and summers are hot, so sealed housings, corrosion-resistant connectors and a wide operating temperature range are sensible choices. The port harbour is shielded by an offshore reef, but that does not remove the salt air.
King Fahd Industrial Port has crude oil, NGL, LPG and chemical terminals among its eight, and handles about 1,800 vessels a year. Jetties, manifolds and pump areas typically need Zone 1 or Zone 2 equipment; terminal operators set their own approval rules.
Plant-side purchasing sits with each refinery or contractor, while Aramco uses its e-Marketplace Platform for registration. Requirements differ between SAMREF, YASREF and Aramco's own refinery. Confirm with the site operator before ordering, and expect any handheld to need approval from the specific plant.
Related guides for Yanbu and for Saudi Arabia.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.