FPSO-based fleet
New pre-salt units such as FPSO Almirante Tamandare (Buzios) and FPSO Alexandre de Gusmao (Mero) started up in 2025; FPSOs carry a full process plant on deck.
This is a regional grouping of offshore production platforms and FPSOs in Brazilian waters, mainly in the Campos and Santos basins. Pre-salt fields supplied 82 per cent of Petrobras production in 2025, so gas-hazard zones exist on process decks and in storage and offloading areas. An IECEx smartphone distributor in Brazilian offshore oil platforms would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Brazilian offshore oil platforms has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Brazilian offshore oil platforms: Gas compression, Cargo tanks and offloading areas, Oil and gas process modules | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Brazil Oil Platforms. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
New pre-salt units such as FPSO Almirante Tamandare (Buzios) and FPSO Alexandre de Gusmao (Mero) started up in 2025; FPSOs carry a full process plant on deck.
Equipment and crews move by supply vessel and helicopter, so spares and replacements need planning.
Petrobras was created in 1953 with a legal monopoly, and a 1997 law ended that monopoly and set up the national petroleum agency ANP as the regulator and supervisor of the industry.
The P-56 project created about 4,000 direct and 12,000 indirect jobs in Brazil, showing the scale of the domestic shipyard and fabrication workforce that supports offshore units.
The semisubmersible P-56 is anchored in 1,670 m of water at the Marlim Sul field, 120 km off the coast, tied back to 21 wells and rated at 100,000 barrels per day with 6 million cubic metres a day of gas compression.
The P-50 platform began production in April 2006 in the Albacora-Leste field of the Campos Basin, a milestone that made Brazil self-sufficient in oil production.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Brazilian offshore oil platforms. FPSOs often involve crews and equipment from several countries, so the IECEx scheme and its certificate of conformity with schedule of conditions are familiar to many visiting contractors. For Brazil, Inmetro-accredited routes also apply. The IS-04Z1 IECEx route remains in progress.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Brazilian offshore oil platforms. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are oil and gas process modules, wellhead areas, gas compression, cargo tanks and offloading areas. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Brazilian offshore oil platforms.
Typically wellhead, process, gas compression, separator and some tank and drilling areas, along with parts of the helideck fuel area. Exact zones, gas groups and temperature classes come from the platform's classification drawings, so confirm them with the operator before taking a device out.
Rules are set by the operator and are usually strict: personal devices are often restricted to accommodation areas, and field devices normally must hold certification for the relevant zone. Check the induction material and ask the safety team which devices are permitted in each area.
Each operator, including Petrobras, Prio, Shell, Trident Energy, Brava Energia and Perenco, applies its own rules on portable devices and approvals. Ask each one for its Ex equipment policy rather than assuming a common standard applies. Confirm with the site operator before any order.
More on Brazil Oil Platforms, and on other places in Brazil.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.