Company-town setting
The town grew around the oil companies, so operator staff, contractors and service firms are concentrated in a small area.
Al Ahmadi is a town in southern Kuwait founded in 1946 after the discovery of oil, and it is the headquarters of Kuwait Oil Company and Kuwait National Petroleum Company. The Greater Burgan field and the Mina Al-Ahmadi refinery, with a stated capacity of 346,000 barrels a day, are close by. Distribution partners for Al Ahmadi are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Al Ahmadi has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Al Ahmadi: Crude and product storage, Marine loading facilities, Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Al Ahmadi. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The town grew around the oil companies, so operator staff, contractors and service firms are concentrated in a small area.
The Mina Al-Ahmadi refinery covers about 10.5 square km along the shore and has been upgraded across 39 units.
Burgan's subsurface reservoirs were discovered in February 1938, and Kuwait Oil Company began commercial oil production there in 1946.
Summer daily highs average 42 to 46 degrees Celsius, so outdoor refinery and wellsite work faces strong heat for much of the year.
CITRA type approval for telecom equipment lasts three years and needs no local representative, while the Public Authority for Industry handles product safety registration.
Mina Al-Ahmadi refinery was first built in 1949, sits about 40 km south of Kuwait City and covers about 10.5 square kilometres.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Al Ahmadi. Al Ahmadi hosts both KOC and KNPC headquarters, and international contractors and EPCs working on upgrades of the Mina Al-Ahmadi refinery or the Burgan field often bring IECEx documentation. A certificate of conformity with a schedule of conditions is what reviewers read. IS-04Z1 IECEx certification is in progress; none is issued.
A distributor for Al Ahmadi would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are refinery process units, oil gathering and processing, crude and product storage, marine loading facilities. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Al Ahmadi.
Kuwait Oil Company for field work and KNPC, now merging with KIPIC, for refinery work. Both run their own procurement and HSE approval processes, so ask each for the current procedure.
Summer highs average 42 to 46 degrees Celsius with a national record of 54, so use devices rated for high ambient temperatures and avoid leaving them in vehicles.
KOC and KNPC each run their own supplier registration and prequalification, KOC through its E-Business portal and KNPC through its eSourcing portal. A device supplier normally needs to be registered before it is considered. Confirm current requirements with the operator.
Other guides for Al Ahmadi, other places in Kuwait, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Name the site and the operator and we will send what is available before launch.