Closed in 2022
ADNOC states the refinery was shut down with zero flaring in 2022, and the land has since been repurposed to suit Abu Dhabi's future needs.
Umm Al Nar Island in Abu Dhabi hosted the UAE's first refinery, inaugurated in 1976, which processed up to 85,000 barrels a day at its peak. ADNOC shut it in 2022 and focused its downstream refining and petrochemicals strategy on Ruwais, so current Zone 1 work is elsewhere. Distribution partners for Umm Al Nar (former ADNOC refinery) are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Umm Al Nar (former ADNOC refinery) has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Where things stand: the IS-04Z1 has not launched, and none of its four certification routes has produced a certificate yet. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Umm Al Nar (former ADNOC refinery): Decommissioned refinery process units (former), Site clearance and demolition works, Relocated process units being reassembled elsewhere in the UAE | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Umm Al Nar Refinery. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The companies on site and the hazardous-area types a handset is likely to meet there.
ADNOC states the refinery was shut down with zero flaring in 2022, and the land has since been repurposed to suit Abu Dhabi's future needs.
ADNOC says the refinery's processing units are being refurbished and reassembled at a location within the UAE, where more than 240 specialist staff will be employed.
The island gave its name to the Umm Al Nar Bronze Age culture of about 2600 to 2000 BCE, so it is better known archaeologically than as a refinery site.
The protected archaeological site is fenced by a concrete wall of about 1,760 m, and it lies between a refinery and a sensitive military area, so works near it face heritage constraints.
Access to the island is across a bridge and is restricted to pass holders, so any clearance or demolition crews need site passes arranged in advance.
Umm Al Nar island lies next to the city of Abu Dhabi and has been enlarged by land reclamation and dredging, so the current shoreline differs from the original.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Umm Al Nar (former ADNOC refinery). The international scheme matters here because refinery equipment from Umm Al Nar is being refurbished and reassembled at another UAE location, and the project teams involved are likely to be international. SAMS would aim to supply a certificate of conformity and schedule of conditions, which are in progress, so that reviewers can check use limits.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Umm Al Nar (former ADNOC refinery). Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are decommissioned refinery process units (former), site clearance and demolition works, relocated process units being reassembled elsewhere in the uae. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Umm Al Nar (former ADNOC refinery).
The archaeological site is protected and fenced by a concrete wall of about 1,760 m, and archaeological fieldwork has continued since 2020. Works near it typically need approval and exclusion zones; confirm requirements with the site owner and the authority responsible for heritage.
Refining is concentrated at Ruwais, about 240 km west of the city, where process units, tank farms and jetties operate. For equipment buyers, Ruwais is the relevant site, while the older Umm Al Nar island is mostly a decommissioned and heritage-sensitive location.
ADNOC describes its downstream refining and petrochemicals as concentrated at Ruwais in the Al Dhafra region, and refinery units from Umm Al Nar are being reassembled at another UAE location. A buyer should ask the relevant ADNOC contractor which site the equipment will serve before specifying anything.
Related guides for Umm Al Nar Refinery and for United Arab Emirates.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.