Joffre site
The site has five NOVA manufacturing facilities: three for ethylene and two for polyethylene.
Red Deer is a central Alberta city, and NOVA Chemicals' Joffre complex lies nearby. It is one of the largest ethylene and polyethylene complexes in the world, with flammable gas and liquid handling throughout. Distribution partners for Red Deer and Joffre industrial area are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Red Deer and Joffre industrial area has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. Operator approval runs on its own timeline. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Red Deer and Joffre industrial area: Ethane feedstock handling, Hydrocarbon storage, Ethylene plants | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Red Deer Industrial. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
The site has five NOVA manufacturing facilities: three for ethylene and two for polyethylene.
A 431 kilotonne per year linear low density polyethylene unit expanded the site's polyethylene capacity by about 40 per cent.
NOVA Chemicals operates more than 385 km of pipelines across Alberta, carrying feedstocks and products between sites and customers.
Nearly 70 percent of Joffre's ethylene is used on site to make over 3.4 billion pounds of polyethylene a year, and the site is 21 km east of Red Deer on Highway 11.
NOVA Chemicals' Joffre site covers 900 acres, with three ethylene and two polyethylene plants, and employs over 800 permanent staff, about 350 resident contractors and up to 1,200 contractors during turnarounds.
NOVA Chemicals has combined with Borouge and Borealis to form Borouge International, so supplier and contractor registration may follow the new group structure; confirm with the company.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Red Deer and Joffre industrial area. Joffre is one of the world's largest ethylene and polyethylene complexes, and its contractors may include firms with international project experience. IECEx documentation, a certificate of conformity with its schedule of conditions, gives a shared reference. The IS-04Z1 is designed for the route, but nothing has been issued.
SAMS is appointing authorised distributors ahead of the Q4 2026 launch. No territory has been granted for Red Deer and Joffre industrial area yet and applications are reviewed company by company. Because a certified Ex device cannot be opened by an ordinary phone workshop without invalidating its certificate, SAMS looks for partners who can provide competent technical support and after-sales service locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are ethylene plants, polyethylene plants, ethane feedstock handling, hydrocarbon storage. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Red Deer and Joffre industrial area.
Yes, about 21 km east on Highway 11, so Red Deer offers hotels, shops and service companies nearby. Confirm freight and customs paths if importing equipment, and check site gate rules.
Central Alberta winters are cold, so batteries and displays suffer at low temperature. Choose low-temperature-rated devices and confirm the operator's winter guidance and temperature class for outdoor areas.
Not without approval. Joffre lies between the two cities, so contractors can come from either, but the operator decides which devices may enter classified areas. A device would need suitable marking and often registration in the plant's system. Ask NOVA's HSE team for its contractor equipment rules.
More on Red Deer Industrial, and on other places in Canada.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.