Portugal: projects and investment
Portugal aims to cover 80% of electricity consumption with renewables by 2030 and has developed a hydrogen strategy to reduce gas imports, which may add hydrogen-classified areas.
The IS-04Z1 is an intrinsically safe Android handset designed for Zone 1 and Zone 21, aimed at the refining and polymer complex at Sines, the chemical plants at Estarreja and the pulp, cement and mining sites in between. The Sines LNG import terminal has three storage tanks with a total capacity of 390,000 cubic metres and regasification capacity of 5.6 million tonnes a year, making Sines Portugal's key gas import site. Distribution partners for Portugal are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Portugal has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Portugal: Estarreja, Matosinhos and Leça, Setúbal and the Sado | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Portugal. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
The main operators, industrial areas and sites that the SAMS Portugal market guide covers.
Portugal aims to cover 80% of electricity consumption with renewables by 2030 and has developed a hydrogen strategy to reduce gas imports, which may add hydrogen-classified areas.
Galp Energia, formed in 1999 from Petrogal, Gás de Portugal and Transgás, is Portugal's largest oil and gas group, with business units covering upstream, refining and midstream, commercial, and renewables.
The Sines hard coal power plant operated from 1985-1989 until January 2021 and coal-fired generation ended in 2021, so former coal sites are being redeveloped.
Oil made up 44% of Portugal's total energy supply in 2023, so fuel storage, port terminals and distribution depots form a large part of the classified-area infrastructure.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Portugal. Sines and Estarreja involve international groups such as Repsol and Dow, plus EPC and maintenance contractors, so IECEx offers a shared scheme beside ATEX. Ask for the certificate of conformity and its schedule of conditions, which fix the marking, ambient range and conditions of use. The IS-04Z1 has none yet issued, and the programme is in progress.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Portugal. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
The market guide for Portugal covers Sines, ZILS Alentejo, Estarreja, Matosinhos and Leça, among others. Site-level pages are linked below.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Portugal.
Portugal is an EU member, so ATEX Directive 2014/34/EU applies to equipment and Directive 1999/92/EC to workplace zoning. Zone 1 and Zone 2 devices should carry CE and Ex markings with instructions in Portuguese where required. Operators usually add their own permit and registration procedures.
Sines hosts Portugal's LNG import terminal, with three storage tanks totalling 390,000 cubic metres and a regasification capacity of 5.6 million tonnes a year. Terminal and port operators set their own induction and device rules, so confirm them before sending equipment.
Yes, Zone 21 dust protection belongs to the same certification programme as the gas marking. In pulp, cement and mineral processing the powder area is the plant, not a corner of it, so check the final certificate and the site's own dust classification with the operator.
Related guides for Portugal and for Portugal.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.