Access
About 6,000 oil and gas personnel live on the island on a rotational schedule, so access is under operator control.
Das Island lies in the Arabian Gulf about 160 km off the UAE mainland, and ADNOC Gas operates five gas processing trains and three dedicated LNG trains there. Gas processing, storage and tanker loading create classified areas across the island. Distribution partners for Das Island are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Das Island has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
For the record, no certificate exists for the IS-04Z1 today. The programme is under way ahead of a Q4 2026 launch. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Certificate of conformity | Number checkable on the IECEx online register | In progress; not issued |
| Standards edition | The IEC 60079 edition the certificate cites | Stated on the certificate when issued |
| Schedule of conditions | Limits of use, batteries and accessories | Published with the certificate |
| Where it applies | Das Island: Crude and LNG tanker loading, Pipelines to Habshan, Gas processing trains | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Das Island. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
About 6,000 oil and gas personnel live on the island on a rotational schedule, so access is under operator control.
Two pipelines of over 200 km, part of the Integrated Gas Development project, link Das Island with the Habshan complex on the mainland.
UAE phones are type-approved by the Telecommunications and Digital Government Regulatory Authority, and the supplier register must be valid for a certificate to be issued.
Abu Dhabi's first offshore platform was installed at Umm Shaif in 1958, and Das Island was turned into the base for those offshore operations.
Das Island airport is the only airport on the island, and about 6,000 rotating staff arrive by air or sea, so travel is tied to the operator's schedules.
The first export cargo of crude oil from Abu Dhabi left Das Island on 4 July 1962, which makes it one of the oldest oil export sites in the Emirates.
IECEx is the international scheme for certifying equipment used in explosive atmospheres. A certificate of conformity is issued by an accredited certification body against a specific edition of the IEC 60079 standards and carries a schedule of conditions of safe use. It is not a legal requirement in most countries on its own, but many national schemes accept it as the technical basis.
The IECEx certificate for the IS-04Z1 is in progress and has not been issued. The marking target is Ex ib IIC T4, the intrinsic safety concept for Zone 1 gas with the hardest gas group (IIC) and a 135 °C temperature class.
In Das Island. Contractors flying onto Das Island often work for international firms and move between projects worldwide. IECEx gives them a common international reference, with a certificate of conformity and a schedule of conditions. SAMS has no IECEx certificate for the IS-04Z1 yet; certification is under way.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Das Island. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not yet. The IS-04Z1 is pre-launch and its certification is still in progress ahead of a Q4 2026 launch. No unit goes into a classified area before the certificate covering it exists. The datasheet, the certification schedule and safe-area evaluation units are available now.
There is no list price yet. SAMS gives indicative pre-launch pricing in writing, against a stated quantity and site, and does not commit to a lead time before certification completes.
No. The IECEx certificate is in progress and has not been issued. SAMS will publish the number when it exists.
Likely candidates are gas processing trains, lng trains, crude and lng tanker loading, pipelines to habshan. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Das Island.
No. Two LNG trains date from 1977 and a third from 1994, and the island has been extended since, including a 2016 southern addition. Older and newer areas may have different area classification and equipment standards, so ask for the drawings.
Radio equipment supplied into the UAE normally needs approval from the Telecommunications and Digital Government Regulatory Authority, with a valid supplier register. Offshore and island sites may also restrict wireless devices, so confirm both with your importer and the operator.
Access is by air and sea under operator control, and ADNOC Gas controls equipment approval and contractor registration for the island. A device would need to meet its requirements before use. Ask ADNOC Gas's procurement and HSE teams about registration, approval and shipping.
Other guides for Das Island, other places in United Arab Emirates, and the pages behind them.
Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.