Access
Habshan is the terminal station of the Etihad Rail network, and the site is remote desert with worker camps.
UAE handsets need type approval from the Telecommunications and Digital Government Regulatory Authority, which also required advanced mobile location testing for cell phones. It yields sales gas, NGLs, condensate and sulphur, so Zone 1 areas cover process, compression and storage units. A hazardous area smartphone distributor in Habshan gas complex would carry the IS-04Z1 to these buyers once certification completes.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Habshan gas complex has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Habshan gas complex: Sulphur and acid-gas units, Gas pipelines, Gas processing trains | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Habshan Gas. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
Who operates there and which kinds of classified area a handset would meet, from the SAMS site research.
Habshan is the terminal station of the Etihad Rail network, and the site is remote desert with worker camps.
Much of the Habshan area is designated Red Zone because of hydrogen sulphide gas, so site-specific safety controls apply.
The Habshan to Fujairah crude pipeline is 406 km long, has a 48-inch diameter and a capacity of 1.5 million barrels a day.
Habshan is the terminal station of the Etihad Rail network, whose commercial operations began in December 2015, giving the site a direct freight rail link.
Habshan is an area in the south-western part of the Emirate of Abu Dhabi that contains oil and gas fields and camps for oil workers.
The area is a major production centre for sulphur, a by-product of the oil industry, so sulphur handling and dust are part of site conditions.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Habshan gas complex. Habshan's classified areas include gas processing trains, NGL and condensate handling, sulphur and acid-gas units and gas pipelines. ADNOC Gas classifies them, not SAMS. Much of the Habshan area is designated Red Zone for hydrogen sulphide, so area classification and sour gas safety rules sit side by side.
Distribution of the IS-04Z1 is by authorised partners only, and SAMS has not yet granted a territory for Habshan gas complex. Each application is reviewed on its merits. Because opening a certified Ex handset in an ordinary workshop invalidates its certificate, the partner must be able to support and service the device locally.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are gas processing trains, ngl and condensate handling, sulphur and acid-gas units, gas pipelines. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Habshan gas complex.
Habshan is the terminal station of the Etihad Rail network, which began commercial operations in December 2015. Rail is commonly used for bulk cargo such as sulphur, but equipment deliveries for a project usually go by road; confirm what is practical with the site operator.
Wikipedia notes that much of the Habshan area is marked as a Red Zone because of hydrogen sulphide gas. In practice that usually means extra gas-detection, breathing apparatus and entry controls on top of normal hazardous-area rules, which are set by the operator and taught at induction.
Habshan is remote desert with worker camps, and it is the terminal station of the Etihad Rail network. Deliveries and repairs are arranged through the operator, so allow lead time. Ask ADNOC Gas's procurement team how spares and replacement devices are received on site.
Other guides for Habshan Gas, other places in United Arab Emirates, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.