Access
Aramco facilities are controlled-access sites; Dammam airport serves commercial travel.
Commercial flights use King Fahd International Airport in Dammam; Ras Tanura's own airport is private and run by Aramco for its employees. Refining, terminal and gas plant areas create Zone 1 conditions. Distribution partners for Ras Tanura are being identified ahead of the Q4 2026 launch of the IS-04Z1.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. Ras Tanura has no appointed SAMS distributor yet: the IS-04Z1 is pre-launch (certification in progress, no certificate issued, launch planned for Q4 2026), and distributor applications are open.
Current position: certification in progress, nothing issued, launch targeted for Q4 2026. A buyer's engineering review is separate from the certificate. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Zone | 0, 1 or 2 for gas; 20, 21 or 22 for dust | Designed for Zone 1 and Zone 21 |
| Gas group | IIA, IIB or IIC | IIC (target) |
| Area drawing | The operator's own classification drawing | Decided by the site operator |
| Where it applies | Ras Tanura: Storage tank farms, Natural gas liquids fractionation (Ju'aymah), Refinery process units | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Ras Tanura. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
Aramco facilities are controlled-access sites; Dammam airport serves commercial travel.
The oil terminal has North and South Piers and a Sea Islands section.
The area was officially called Rahima from 1941 until 1986, when the historical name was restored, so older Aramco documents and maps may use the earlier name.
The marine complex is described as handling over 2,000 tankers a year, using an artificial island, north and south piers and the Ju'aymah crude terminal.
The governorate's industrial infrastructure is centrally managed and operated by Saudi Aramco, so a single operator's rules cover refinery, terminal and gas plant work.
Ras Tanura is a peninsula governorate bordered by Jubail to the north and Qatif to the west and south, so road access runs through neighbouring governorates.
A hazardous area is a place where flammable gas, vapour or combustible dust may be present. Standards divide these into zones: Zones 0, 1 and 2 for gas and vapour, and Zones 20, 21 and 22 for dust. Zone 1 and Zone 21 are the tier where an explosive atmosphere is likely to occur in normal operation, which is where the IS-04Z1 is designed to work. Anything carried in must be marked for the zone, gas group and temperature class of the area.
No certificate has been issued for the IS-04Z1 yet, so it must not be taken into a classified area until the certificate covering it exists and the site operator has accepted it.
In Ras Tanura. Ras Tanura's classified areas include refinery process units, terminal piers and sea islands, storage tank farms and natural gas liquids fractionation at Ju'aymah. Aramco as operator classifies them; SAMS does not. A buyer should request the area drawings for the specific unit before choosing equipment.
A distributor for Ras Tanura would carry the IS-04Z1 after certification completes; the Q4 2026 launch is the planning date and no appointment has been made. SAMS reviews applicants one by one and prefers companies with their own Ex-competent technical and service staff, since certified devices must not be repaired outside approved channels.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
SAMS has not published a price. Any figure you are offered for an uncertified Ex phone should be treated with caution; written indicative pricing is available for a defined quantity and site.
Zone 1 and Zone 21 (gas and dust) with gas group IIC and temperature class T4, subject to certification. It must not be used in a classified area before its certificate is issued and the site has accepted it.
Likely candidates are refinery process units, crude export terminal piers and sea islands, storage tank farms, natural gas liquids fractionation (ju'aymah). Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Apply through the distributor page with your company details and the territory you cover. SAMS reviews applications company by company and has not yet granted a territory for Ras Tanura.
The area was officially named Rahima from 1941 until 1986, when Ras Tanura was restored. Drawings, maps or inspection records may therefore use either name, so make sure the area names in any asset register or work permit are matched before ordering equipment.
Visitors normally fly to King Fahd International Airport in Dammam and drive; Ras Tanura's own airport is private and operated by Aramco for its employees. A two-lane highway connects to the Dhahran to Jubail Highway. Site access is arranged through the host.
It can be. The peninsula is on the Gulf, so salt, humidity and heat apply on top of desert dust. IP68 sealing helps, but check the datasheet for the temperature range and for any limits on cleaning or exposure. Ask the operator about its own environmental requirements.
Related guides for Ras Tanura and for Saudi Arabia.
Share the site details and quantity. You will get the datasheet and the certification schedule back by email; pricing is indicative only until launch.
Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.