ExxonMobil site
ExxonMobil states that its 592,000-barrel-per-day Singapore refinery is fully integrated with its Singapore Chemical Plant.
Singapore's petrochemical sector is concentrated on Jurong Island, a roughly 3,000-hectare park with over 100 companies, and on Pulau Bukom. Major Hazard Installations in Singapore need documented hazardous area classification drawings under the Workplace Safety and Health framework overseen by MOM and SCDF. This page explains what to look for in an explosion proof smartphone for Singapore petrochemical sector, and where the IS-04Z1 stands against that list today.
Pre-launch · certification in progress · Launching Q4 2026
Short answer. The SAMS IS-04Z1 is the intrinsically safe smartphone covered here for Singapore petrochemical sector: pre-launch, designed for Zone 1 and Zone 21 (marking target Ex ib IIC T4), with certification in progress and no certificate issued.
Status: pre-launch. IECEx, ATEX, UKEX and NEC 500 certification is in progress and no certificate has been issued; launch is planned for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.
| Check | What to look for | IS-04Z1 today |
|---|---|---|
| Protection concept | Flameproof (Ex d) or intrinsic safety (Ex i) | Intrinsic safety, level ib |
| Zone suitability | Zone 1 gas and Zone 21 dust | Design target for Zone 1 and 21 |
| Certificate | Number, issuing body and schedule of conditions | In progress; not issued |
| Where it applies | Singapore petrochemical sector: Cracker process units, Chemical derivative plants, Tank farms | Classified by the site operator |

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in Singapore Petrochemical. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.
A short profile of the site and the kinds of classified area that matter for portable equipment.
ExxonMobil states that its 592,000-barrel-per-day Singapore refinery is fully integrated with its Singapore Chemical Plant.
Aster, a joint venture led by Chandra Asri with Glencore, describes a 237,000-barrel-per-day refinery and 1.1 million tonne per year ethylene cracker at Pulau Bukom, plus petrochemical production on Jurong Island.
A world-scale renewable diesel plant using palm oil as feedstock was completed in Tuas in 2010, showing that petrochemical-type processing also exists outside Jurong Island.
Singapore produces no crude oil or feedstock of its own, so the petrochemical complex depends on imported feedstock arriving through jetties and tank farms.
Pulau Bukom has hosted Singapore's refining industry since 1961, when it became the site of the nation's first oil refinery.
Natural gas is the main fuel for Singapore's power generation, and the LNG terminal on Jurong Island can supply about 9 million tonnes a year on average to power and industry.
“Explosion proof” is the phrase most buyers use for equipment that may be taken into a classified hazardous area. Strictly, it covers several protection concepts: a flameproof enclosure (Ex d) contains an internal explosion, while intrinsic safety (Ex i) limits electrical energy so that an ignition cannot start. Phones are normally intrinsically safe, because a flameproof handset would be too heavy to carry all shift.
The IS-04Z1 uses intrinsic safety, with a marking target of Ex ib IIC T4, and is designed for Zone 1 and Zone 21. It is pre-launch, certification is in progress and no certificate has been issued.
In Singapore petrochemical sector. In a cracker or derivative plant, explosion-proof is a general phrase. Flameproof Ex d housings suit fixed equipment, while a handheld phone around process units depends on intrinsic safety. The IS-04Z1 is designed on that basis. Certification is in progress, and plant rules still decide where a phone may be used.
A short checklist for anyone writing or reviewing the specification, with the IS-04Z1 status against each point.
Not today. Until the certificates are issued the IS-04Z1 stays out of classified areas, and until launch there is nothing to purchase. You can ask for the datasheet and the certification schedule, or book a safe-area evaluation unit.
No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.
It is intrinsically safe (marking target Ex ib IIC T4), which is the usual way to make a phone for hazardous areas. It is not a flameproof (Ex d) design, and certification is still in progress.
Likely candidates are cracker process units, chemical derivative plants, tank farms, polymer handling and dust areas. Which areas are classified, and to what zone, is set by the site operator's own area classification drawings.
Not exactly. Explosion proof is a broad everyday term; intrinsic safety is one protection concept, which limits energy so ignition cannot occur. Flameproof (Ex d) is a different concept that contains an explosion. The IS-04Z1 is intrinsically safe by design.
Common examples include cracker and reactor areas, pump and compressor houses, tank farms, jetties and polymer or powder handling, where dust zones can also arise. Zone 1 is common around seals and vents, but classification is set per plant, so ask for the area drawing.
Singapore has no crude oil or feedstock of its own, so material arrives by sea, is stored in tank farms and caverns, and is sent through pipelines. This creates busy jetty and transfer areas where equipment control is strict.
Not safely. Each plant runs its own contractor and equipment approvals, so acceptance at one plant does not carry over to a neighbour. Prepare a datasheet pack for each. Confirm requirements with the site operator at every plant.
Other guides for Singapore Petrochemical, other places in Singapore, and the pages behind them.
Send the site, zone and gas group and roughly how many handsets. We reply by email with the datasheet and the certification schedule.
Send the zone and gas group of your site and we will reply with the datasheet and schedule.