Skip to content
Certification In Progress · Launching Q4 2026 Become a Distributor
Certification In Progress · Launching Q4 2026 Product Certifications Industries Blog About Contact Become a Distributor
United Arab Emirates · ATEX and IECEx

ATEX and IECEx Smartphone Supplier in United Arab Emirates

Jebel Ali, about 35 km south-west of Dubai, has the largest man-made harbour in the world, and JAFZA hosts over 8,700 companies. Launch is Q4 2026, so what we can share now is the specification, the certification schedule and an evaluation unit. Buyers searching for an ATEX and IECEx smartphone supplier for United Arab Emirates can take the datasheet and the certification schedule for the IS-04Z1 now; supply follows certification.

Pre-launch · certification in progress · Launching Q4 2026

SAMS IS-04Z1 intrinsically safe smartphone for United Arab Emirates, front view
Marking targetEx ib IIC T4Intrinsic safety, Zone 1 / 21 design target · certification in progress
AvailabilityQ4 2026via authorised distributors
Search topicATEX and IECEx
DeviceSmartphone
RouteSupply
WhereUnited Arab Emirates

Short answer. An ATEX and IECEx smartphone for United Arab Emirates cannot be bought yet: the SAMS IS-04Z1 is pre-launch (certification in progress, no certificate issued), and the datasheet, certification schedule and safe-area evaluation units are available now.

Current position: certification in progress, nothing issued, launch targeted for Q4 2026. An operator's own vendor approval is a separate step. Certification status. Place facts reviewed October 2026.

At a glance · ATEX and IECEx

Checklist: ATEX and IECEx smartphone for United Arab Emirates

Specification checklist against the IS-04Z1 today
CheckWhat to look forIS-04Z1 today
MarkingII 2 G Ex ib IIC T4 on the rating plateDesign target; not yet marked
EU-type examination certificateNotified body number and certificate IDIn progress with TÜV; not issued
IECEx certificate of conformityNumber listed on the IECEx online registerIn progress; not issued
Where it appliesUnited Arab Emirates: Upper Zakum, Musaffah, RuwaisClassified by the site operator
Product · United Arab Emirates

The product behind this search: the SAMS IS-04Z1.

SAMS IS-04Z1 explosion proof mobile phone, front view

SAMS IS-04Z1

An intrinsically safe Android smartphone designed for Zone 1 and Zone 21 hazardous areas in United Arab Emirates. It is pre-launch: IECEx, ATEX and NEC 500 certification is in progress ahead of the Q4 2026 launch.

  • IP68 sealed
  • 4,000 mAh battery
  • 50 MP camera
  • Android 16
  • Zone 1 / Zone 21 design target
The market · United Arab Emirates

Where this applies in United Arab Emirates

The classified areas, operators and sites below are the ones covered in the SAMS United Arab Emirates market guide.

Operators, EPCs and contractors

ADNOC Onshore
Bab, Bu Hasa, Asab and Sahil field operations
ADNOC Offshore
Upper Zakum, Umm Shaif, Umm Lulu and SARB
ADNOC Gas
Habshan processing and the Das Island LNG plant
ADNOC Refining
Ruwais refinery, tankage and product movements
Borouge
Polyolefin production inside Ruwais Industrial City
TA’ZIZ
Chemicals and transition-fuels zone under construction at Ruwais

Industrial areas and sites

Ruwais
Refining, polyolefins and the new chemicals zone
Habshan
Onshore gas processing and NGL recovery
Das Island
Offshore gathering, liquefaction and tanker loading
Zirku Island
Crude processing, storage and export
Upper Zakum
Artificial-island development in the offshore fields
Musaffah
Fabrication yards, workshops and industrial support
Field notes · United Arab Emirates

More about United Arab Emirates that matters for portable equipment

United Arab Emirates: geography and layout

The UAE stretches more than 650 km along the southern shore of the Persian Gulf, and most of the coast consists of salt pans that extend far inland.

United Arab Emirates: rules and approvals

TDRA type approval certificates last three years, need no local representative but a compliance mark, and a valid supplier registration is required.

United Arab Emirates: industry on the ground

Ruwais, now often called Al Dhannah and about 240 km west of Abu Dhabi, is an ADNOC industrial complex centred on a refinery inaugurated in 1982, with gas processing, fertiliser and petrochemical plants.

United Arab Emirates: logistics and access

Port of Fujairah on the Gulf of Oman is the world's second-largest bunkering hub, with two oil terminals commissioned in 2006 and 2010.

The term · ATEX and IECEx

What “ATEX and IECEx” means for a smartphone

ATEX is the European legal framework for equipment used in explosive atmospheres (Directive 2014/34/EU). IECEx is the international certification scheme built on the IEC 60079 standards. Buyers outside Europe often ask for both: an IECEx certificate is the technical evidence most national regimes build on, while ATEX is the legal route into the European market.

For the IS-04Z1 both routes are in progress with TÜV in Germany and neither certificate has been issued. The marking target is II 2 G Ex ib IIC T4: equipment Group II (surface industry), Category 2 (Zone 1 gas), protection concept ib (intrinsic safety), gas group IIC and temperature class T4.

In United Arab Emirates. A UAE procurement or HSE reviewer at ADNOC companies would expect certificate evidence that names the scheme, marking and ambient range, and a dual ATEX and IECEx route helps international contractors and EPCs working across Abu Dhabi and the northern emirates. The IS-04Z1 certification is in progress and no certificate has been issued.

The route · supply

Sourcing the IS-04Z1 for United Arab Emirates

There is no stock to order for United Arab Emirates yet. The IS-04Z1 is pre-launch, certification is in progress, and supply will run through authorised distributors after the certificates are issued. Procurement teams can prepare now with the datasheet, the certification schedule and a safe-area evaluation.

  1. 01

    Request the datasheet

    The technical specification, marking target and conditions of use, sent by email.

  2. 02

    Ask for the certification schedule

    Which certificates are in progress, in what order, and what is still to be confirmed.

  3. 03

    Evaluate in a safe area

    Evaluation units can be used for connectivity, MDM enrolment and workflow testing outside classified areas.

  4. 04

    Register for launch

    Tell us the site, zone, gas group and quantity so the right authorised distributor can contact you.

Questions · United Arab Emirates

Frequently asked questions

Can we buy an ATEX and IECEx smartphone in United Arab Emirates today?

No. Nothing can be bought or taken into a classified area today: certification is in progress and launch is planned for Q4 2026. What is available now is the datasheet, the written certification schedule and evaluation units for safe-area use.

What does an ATEX and IECEx smartphone in United Arab Emirates cost?

No price is published. While certification is in progress there is no list price and no committed lead time, and a supplier quoting a firm figure for an uncertified Ex handset is promising something it cannot stand behind. Indicative pre-launch pricing is issued in writing against a stated quantity and site.

Is the IS-04Z1 ATEX and IECEx certified?

Not yet. Both routes are in progress with TÜV in Germany and no certificate has been issued. Any listing that says otherwise is wrong.

Which sites in United Arab Emirates does this cover?

The market guide for United Arab Emirates covers Ruwais, Habshan, Das Island, Zirku Island, among others. Site-level pages are linked below.

How will SAMS supply United Arab Emirates?

Through authorised distributors once certificates exist. Until then SAMS can send the datasheet and certification schedule and arrange safe-area evaluation units.

Which Ministry handles product safety conformity?

The Ministry of Industry and Advanced Technology handles safety declarations of conformity, listed as valid for one year with a local representative required. This is separate from the TDRA telecom approval, so ask your supplier to confirm both.

Where are the main hazardous-area sites in the UAE?

Ruwais and the Abu Dhabi oil and gas fields, Fujairah's oil terminals, Jebel Ali in Dubai, with its power, desalination and aluminium smelter complex. Each belongs to a different operator.

Can the IS-04Z1 be used on an offshore island such as Das or Zirku?

It is designed with a 4,000 mAh battery and a fully sealed body to stay in service until the next rotation, since there is no same-day replacement. Certification is in progress. Confirm area classification and permit rules with the operator before any use.

Enquiry · United Arab Emirates

Ask about the IS-04Z1 for United Arab Emirates

Tell us what you need to equip and where. The SAMS team answers by email with the datasheet and where each certification route stands.

Enquiry · United Arab Emirates

Please enter your name.
Please enter your company name.
Enter a valid email address.
Please enter your target market.
Please select one.

Launching Q4 2026

Planning for United Arab Emirates?

Tell us the zone, gas group and operator. We will send the datasheet and the certification schedule.